Bridges and Tunnels Transportation

Spain Invas Puts Tender

📄 Tender ID: 462858762 📅 Published: 05 Jun 2021

📋 Tender Overview

The bridge that ensures passability in the Los Curos - Malaga corridor is located at km 118 900 it has a two-lane pedestrian and vehicular crossing has a length of 79 meters is made up of three metal beams reinforced concrete slab and stirrups moored with passive anchors.With the commissioning of this bridge the dismantling of the provisional semi-permanent metal bridge installed last year INVAS-Military Engineers agreement began to provide trafficability in the area after the emergency registered in 2020.For emergency care other bridges are also being built km 119 070 km 121 232 and km 121 750 and a false tunnel at km 118 754.In this corridor the national government through INVAS invests 503639 million to attend to emergencies and paving projects works that register an advance of 63 and 92 respectively.Fulfilling the commitment of the national government with the users of the Los Curos - Malaga road after the emergency registered on February 25 2020 due to the winter wave the National Institute of Roads INVAS has put into operation the bridge located at km 118 900.The Minister of Transport ngela Mara Orozco Gmez said We made a commitment to the department of Santander and we are complying with facts with the commissioning of this bridge we contribute to improve the conditions of trafficability in this region that was affected by a of the winter seasons registered last year .For his part the technical director of INVAS Guillermo Toro Acua stated The bridge with a two-lane vehicular passage and a pedestrian crossing is 79 meters long is made up of three metal beams with elements that stiffen the structure Reinforced concrete slab and stirrups tied with passive anchors. At this time the provisional metal bridge installed in an agreement with the Military Engineers Battalion last year is being dismantled to maintain passability through this corridor. It should be noted that in order to improve the geometric alignment of the corridor the construction of other bridges is underway km 119 070 km 121 232 and km 121 750 a false tunnel at km 118 754 slope stabilization works bank recovery and construction of hydraulic structures. These works register in their entirety an advance of 63 .On this road through which nearly 100000 inhabitants of the Garca Rovira province move towards Bucaramanga a torrential avenue flow of mud and rocks was registered on the night of February 25 2020 leaving them incommunicado. to the inhabitants of the municipalities of Los Curos Santa Brbara Guaca and San Andrs. In order to guarantee the walkability of users at the time INVAS together with the Military Engineers Battalion installed a temporary metal bridge while the work was being carried out at this point.Likewise the national government through INVAS carries out paving works of 26 km in the corridor that today register an advance of 92 and with the aim of completing the paving process within the framework of the Commitment for Colombia program it allocated 320000 million that are in the process of legalization. In total the entity invests 503639 million in this region of the country .With this type of action the national government through the National Highway Institute ratifies its commitment to safe trafficability and economic reactivation in Santander and other regions of the country.

🔍 Key Information

📄
Tender Reference No.
462858762
📅
Publication Date
05 Jun 2021
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
Spain

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 05 Jun 2021
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Spain
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…