📋 Tender Overview
The Ministry of Transport Mobility and Urban Agenda Mitma is executing the improvement works of the N-1 road between Rubena and Fresno de Rodilla in the province of Burgos which have a budget of 9 million euros VAT included. Because of them and in order to guarantee the safety of workers and users the circulation of that road will be cut at night from 2300 p.m. to 600 a.m. the next day between May 22 and 26.To ensure the flow of traffic the following alternative itineraries will be enabled duly signpostedThe exit from Burgos on the N-I towards Irn will be made using the AP 1 from Rubena to Briviesca.Similarly access to Burgos from Irn will be via the AP-1 from Briviesca.In addition a signaling system will be implemented to allow controlled access to the N-1 road to those vehicles whose destination is the intermediate locations that cannot be reached from the highway and temporary detours will be made between km 251.252 and 254.255 in both directions of circulation. These detours will direct vehicles coming from or wishing to access these intermediate locations to the temporary branches of the links under construction on the right bank.The necessary measures will be taken to clearly signal the detours and signposts will be present to attend to any traffic incidents and provide information on the detours.Characteristics of the worksWhile the affectations last the execution of the prefabricated elements of the boards of the access links to Rubena and Quintanapalla will be carried out at the height of km 251620 and 254060.The aim of the work is to eliminate the existing shortcuts to the N-1 road redistributing these connections through new service roads which will improve the operating conditions of the N-1 and road safety.