📋 Tender Overview
The Ministry of Transport Mobility and Urban Agenda Mitma faces the final stretch of the works of the section El Burgo de Osma San Esteban de Gormaz West of the A-11 motorway in the province of Soria with the extension of the last layer of firm the tread layer.This extension will take place next Wednesday May 3 at 700 am starting work on the road towards Soria and ending on the road towards Valladolid. The work is expected to be completed by the end of May. This fact will cause damages on the N-122 road.Therefore it is necessary to practice a series of minor detours that will redirect traffic between the different roads altering the circulation of vehicles minimally so that the work can be carried out safely.Once the extension is finished it will be possible to circulate on each of the two roads with two lanes in each direction and the San Esteban de Gormaz link East will be completely opened. However the speed will be limited to 80 km h until the work is completed and the highway is definitively opened.In addition the new section of service road has been opened parallel to the future A-11 between the towns of San Esteban de Gormaz and Burgo de Osma whose layout coincides mostly with the N-122 and N-122R roads joining both roads and modifying the access to the town of Alcubilla del Marqus.These works are an important step in the improvement of the itinerary since the traffic will be completely unfolded taking each direction to a complete roadway.For the first time it will be possible to have two lanes in each direction on each road although the speed will be limited to 80 km h throughout the section until the completion of the works and the commissioning as a highway.