📋 Tender Overview
The Ministry of Transport, Mobility and Urban Agenda (Mitma) will carry out tonight the load test of a structure of the M-40 motorway, with the aim of guaranteeing its correct behavior, after the repair works carried out on the right carriageway of the viaduct located at kilometer point 51 and adjacent to the Pardo tunnels, in Madrid.
This load test will be carried out in order to conclude with the structural requirements derived from the repair and reinforcement work already carried out on the aforementioned structure.
For this reason, and to guarantee the safety of workers and users, from 23 pm today, Thursday, September 28, there will be a complete cut of the M-40 at km 51 towards the airport, as well as the M-30 branch towards M-40 towards A-6 (A Coruña). Traffic will be restored at 5:30 a.m. tomorrow, Friday, September 29.
The sections affected by the cuts have alternative routes nearby, through two changes of direction close to the construction area:
At km 51 of the M-40, take the branch to M-30/A-6 and taking the change of direction that is 1 km away, in the M-40 direction.On the M-30 from exit 25 towards Pza. Moncloa, taking direction A-6.