Roads and Highways Roadways

Spain Impact Traffic Tender

📄 Tender ID: 489382768 📅 Published: 06 Jun 2023

📋 Tender Overview

The Ministry of Transport, Mobility and Urban Agenda (Mitma) will hold a simulation tomorrow, Tuesday, June 6, in the Fuentebuena tunnel, on the BU-30 ring road (Burgos). The cut to traffic will be made in both directions between 9:00 a.m. and 13:30 p.m.

To carry out the drill, the tunnel will be cut in both directions, so it is necessary to establish detours. As the tunnels are located on the Burgos ring road itself, you can take any destination using the open part of the round.

The deviations will be as follows:
Vehicles travelling on the A-73 to Vitoria, Logroño or Madrid:
You will find a total traffic cut at km 1,360 of the A-73, being directed to the roundabout lower than the BU-30, located at km 20,400 (Villatoro neighborhood area) where you can take the BU-30 in the Valladolid-León direction, and later, at the Landa junction, take the A-1, and, from there, complete the ring road that will allow them to go to Madrid, Logroño or Vitoria.

Vehicles travelling on the A-1 from Vitoria to León or Santander:
You will find a traffic cut located at km 248,800 of the A-1 motorway, Villimar area, and you must continue to the Landa Nudo where you will take the BU-30 and, from there, you can take destinations León or Santander, following the existing signage.

Vehicles circulating on the A-1 from Madrid and N-120 Logroño to Santander:
For these movements, the ideal is to take the ring road initially towards León and drive along the BU-30 until exit 21 and from the lower roundabout take A-73 towards Santander.

The cut will affect the exit to Santander located at km 246,800 of the A-1, exit 246B. The alternative is -once passed next to the Campofrio factory-, access the Villafria roundabout, exit 246A and make a change of direction, for once arrived at the Landa Knot, take the BU-30 until exit 21.

Vehicles circulating on the BU-V-5021 road, coming from Poza de la Sal or from Avenida Alcalde Martin Cobos and C / Rio Viejo de Burgos to Santander or León:
The vehicles that circulate on this road will find closed the branch that gives access to the BU-30 towards Santander. For these destinations, Santander or León, you must take BU-30 and A-1, direction Madrid to the Landa Nudo and then drive on the BU-30 until exit 21.

The corresponding signage of the detours will be installed. In addition, all those vehicles approaching Burgos through the A-1, AP-1, A-62 and A-231 motorways, will be warned well in advance of the cut of the BU-30 in the tunnel and the aforementioned detours, through the variable message panels.

Objective of the drill
The objective of this simulation is to verify the effectiveness of the action protocols established in the Tunnel Self-Protection Plans in the event of an accident involving people inside the tunnel. Thus, the detection of the accident and the activation of the protocol of action of the tunnel conservation personnel are verified, which includes, in this case, the closure to traffic of both tubes since an event with vehicle fire in the south tube will be simulated, being necessary the occupation of the north tube for attention to victims and fire extinction, the notification to external emergency services and the follow-up of assistance.

🔍 Key Information

📄
Tender Reference No.
489382768
📅
Publication Date
06 Jun 2023
🌐
Sector
Roads and Highways
📝
Notice Type
News
📍
Location
Spain

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 06 Jun 2023
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Spain
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…