📋 Tender Overview
The Ministry of Transport Mobility and Urban Agenda Mitma is executing the works of humanization and calming of traffic on Avenida das Pas FE-14 road in the municipality of Ferrol A Corua.For this reason there will be new effects on traffic from next Friday May 5 at 800 am which will consist of cutting the branch that connects Esteiro Avenue Trinchera road FE-11 with Das Pas Avenue FE-14 road direction exit city.Therefore the following alternative itineraries are proposed from the Diapasn roundabout to join Avenida das Pas FE-14 road at the A Gndara linkOption A Carretera de la Trinchera FE-11 road and Nicasio Prez Avenue FE-13 roadOption B Telleiras street and Avenida do Mar.During the completion of this cut traffic on Avenida das Pas FE-14 road will remain open in the direction of entry to Ferrol in the section between the Pas bridge and the Esteiro link trench road FE-11.Characteristics of the worksThe causes that motivate this cut are to start the execution of the new roundabout at level that will connect the road of the Trench FE-11 with the avenue das Pas FE-14 for which it is necessary to cut the connection branch that connects the avenue of Esteiro road of the trench FE-11 with the avenue das Pas road FE-14 Direction exit city to overlap this road with the works being incompatible to keep it in service.The first works for the execution of the roundabout at level contemplated in the project will consist of executing a bypass on the right bank of the Trinchera road FE-11 in the direction of A Gndara a detour necessary to subsequently execute the demolition of the current underpass of the FE-14 on the FE-11 in safe conditions.The works of execution of the bypass require the demolition of the firm and the excavation of the land where the current branch object of cut is located until the final grade of the bypass which will coincide with the grade of the roundabout collected in the project.In addition work will begin on the execution of the drainage network for the FE-14 road and the future roundabout tasks that will require the opening of trenches placement of tubes and filling compacting of the trenches.These works are included within the earthmoving actions prior to the construction of the new access to the city of Ferrol which will replace the current configuration of the FE-14 and will improve the permeability of the neighborhoods of Ultramar and Esteiro.