📋 Tender Overview
The Ministry of Public Works and Communications (MOPC) continues with the execution of phase B of the Pilar Coastal Defense, in the department of Neembucu. Currently, work is focused on the construction of pumping stations that will be part of the sanitary sewage and storm drainage system, a fundamental infrastructure to improve the quality of life of residents in the south of the country. In a verification visit carried out this afternoon, the Minister of Public Works, Eng. Claudia Centurion, highlighted the social scope of this intervention. This is one of the 20 pumping stations that we are going to build, plus a large treatment plant to provide quality of life, health to all Pilar residents and, of course, better living conditions, he said. In this stage, the excavations corresponding to pumping station number 11 are being carried out, one of the 20 planned within the citys sewage system. Phase B also includes the installation of 146 kilometers of sewage network, the construction of a wastewater treatment plant and an adductor that will convey the treated water to the Paraguay River. In addition, 13.7 kilometers of storm drain pipes of different sizes are being built. This infrastructure will allow rainwater to be efficiently channeled into streams, reducing the risk of flooding in neighborhoods and strengthening the urban resilience of the departmental capital. About Coastal Defense Phase A of the Coastal Defense, completed last December, included the construction of a 9-kilometer defense wall that today protects some 33,000 people against the flooding of the Paraguay River and nearby streams. This first stage also incorporated complementary drainage systems, which contributed to providing Pilar with a safer infrastructure against flooding events. The works corresponding to phase B were awarded by the MOPC to the Neembucu Sanitary Consortium, made up of LT S.A., Constructora Heisecke S.A. and Benito Roggio e Hijos S.A. The inspection is carried out by CIALPA S.A., under technical supervision of the MOPC. Date: May 8, 2026