📋 Tender Overview
The improvement project of the Luciano Castillo Colonna Technological Institute, in the province of Talara, has already been completed and is ready to begin the reception process, after completing all the work and the assisted operation stage, in which the correct functioning of the modern equipment was verified.
The work, executed by the Regional Government of Piura, required an investment of more than 17 million soles and will directly benefit nearly 500 students, strengthening technical and productive training in the province.
Among the main components of the project, the modern vehicle technical inspection plant stands out, equipped with systems for diagnosis, brake inspection, alignment, emissions control and lighting verification, aimed at guaranteeing automotive safety and maintenance standards.
Likewise, the institute has a frozen plant for hydrobiological products with a capacity of 25 tons, as well as a navigation simulator, which will allow students to carry out virtual maneuvering practices on the high seas, strengthening their training.
The project also includes improvements in infrastructure, furniture, equipment and bibliographic material, consolidating a modern educational environment that will contribute to raising the quality of technical education in the province of Talara.