Energy, Power and Electrical

Slovenia Report Protection Tender

📄 Tender ID: 510247176 📅 Published: 07 Nov 2024

📋 Tender Overview

Report on protection against ionizing radiation and nuclear safety in the Republic of Slovenia in 2023, which was adopted by the Government of the Republic of Slovenia on 17 in July 2024 at its 113th regular session.

The report was prepared on the basis of the Act on Protection against Ionizing Radiation and Nuclear Safety at the Nuclear Safety Administration (URSJV). The URSJV has been preparing this type of report for almost 40 years in cooperation with other competent authorities, and it summarizes all events related to protection against ionizing radiation and nuclear safety in the past calendar year. All reports are available in electronic form on the Open Data of Slovenia (OPSI) portal.

In 2023, the fundamental goal of nuclear and radiation safety was successfully achieved - the protection of people and the environment against the unnecessary harmful effects of ionizing radiation. The main highlights of the 2023 report are as follows:
The Krško Nuclear Power Plant (NEK) operated safely last year, and five incidents were reported that had no impact on the population or the environment. The first of four planned fuel element transfer campaigns was carried out, in which 592 fuel elements were transferred from the spent fuel pool to the newly constructed dry spent fuel storage facility at the NEK site. The third periodical safety inspection of the NEK, which began in 2020, was also completed. URSJV approved the report and the action plan, which the NEK will have to fulfill in the next five years. This fulfilled the last condition for the continued operation of the NPP, namely for the next ten years.

The EU directive on nuclear safety prescribes the performance of topical expert reviews (English Topical Peer Review - TPR) every six years. Their purpose is to review a certain area that is important for nuclear safety in all European countries at the same time. In 2023, the second TPR started on the subject of fire safety in nuclear facilities. URSJV sent the Slovenian national report to the European Nuclear Safety Regulators Group (ENSREG) in October.
In 2023, the TRIGA Mark II research reactor operated safely in stationary and pulsed mode for a total of 140 days. In 2023, there were three automatic shutdowns of the reactor, but there were no events that required reporting to URSJV. The second periodic safety inspection of the nuclear facility of the TRIGA research reactor and the hot cell facility continued. The Jožef Stefan Institute sent the last seven thematic reports for individual security content to the URSJV for review.

ARAO - The Agency for Radioactive Waste continued activities for the construction of a low- and medium-level radioactive waste disposal site (NSRAO) in Vrbina pri Krškem. In March 2023, a separate construction permit was issued for the infrastructure facilities of the NSRAO landfill, the construction of which also began and ended at the end of April 2024. The construction permit for the nuclear part of the NSRAO landfill became final in July 2023 after an appeal and court proceedings at the Administrative Court of the Republic of Slovenia , and in mid-2023 ARAO announced a tender for the construction of facilities for the nuclear part of the landfill. The tender was successfully completed in 2024 with the signing of the contract.

The Interstate Commission for Monitoring the Implementation of the Agreement between the Government of the Republic of Slovenia and the Government of the Republic of Croatia on the regulation of status and other legal relationships related to investment in the Krško Nuclear Power Plant, its exploitation and decommissioning has set a new deadline for the acceptance of waste from the NEK in October 2023, namely that they must At the beginning of 2028, the Republic of Slovenia and the Republic of Croatia will start taking over NSRAO from NEK. Until then, NEK must ensure the safe storage of NSRAO.
The Boršt hydrometallurgical tailings dump of the former uranium mine in Žirovske vrh has not yet been closed. The activities of supplementing the safety report, which will be the basis for the closure of the landfill, took place.

Monitoring of radioactivity in the environment took place without problems in 2023. Based on the results of the measurements, it is established that the burden on the inhabitants of Slovenia due to the presence of artificial radionuclides in the environment is below all legally defined limits and comparable to previous years. Also, the operational monitoring of all taxpayers took place according to the planned annual programs, and the activities of radioactive substances released into the environment were below the authorized limit values. As a result, the burden on residents was less than prescribed and negligible compared to the ever-present natural background.

In 2023, a reassessment of the annual dose due to natural background radiation in Slovenia was also carried out. Radon and its progeny contribute the most to the annual dose. Considering the varied geological composition of Slovenia, the range of annual dose in Slovenia is wide and ranges from 2 mSv for the municipality with the lowest average concentration of radon in buildings, i.e. the Municipality of Piran, to almost 18 mSv for the municipality with the highest concentration, i.e. the Municipality of Mirna Pe?.

In 2023, there were no major problems with operators of radiation activities. The URSJV dealt with a total of 29 intervention cases. The main reason for the large number is still the contamination of waste with radiopharmaceuticals in Slovenia, which otherwise did not result in increased exposure of residents or workers at waste disposal sites. The number of interventions related to the measurement of postal shipments has decreased compared to previous years.
Last year, the new Resolution on the National Program for the Management of Radioactive Waste and Spent Fuel for the period 2023-2032 entered into force.

🔍 Key Information

📄
Tender Reference No.
510247176
📅
Publication Date
07 Nov 2024
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Slovenia

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 07 Nov 2024
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Slovenia
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…