📋 Tender Overview
At the beginning of July the concreting of the last phase of the bridge over the Savinja River in Marija Gradec was successfully completed.As part of the construction of the bridge which began in 2019 the last major phase on the bridges lintel construction was completed and thus most of the work on the bridge was completed. To complete all work on the bridge it is necessary to arrange curbs drainage asphalt and equipment.In the second half of July the arrangement of road infrastructure will continue and the construction of a new three-lane traffic light intersection is planned which will connect the bridge with the existing road. Due to the location of the intersection part of the existing road needs to be rebuilt. In this area it will run to the right of the existing one in the direction of Rimske Toplice. The works are expected to be completed by the end of 2020.The works are co-financed with European funds under the Connecting Europe Facility within the project Upgrading the Zidani most Celje railway line.