📋 Tender Overview
Faced with the severe heat, the Southern electricity industry is promoting electricity saving propaganda on central and local mass media and internal communication channels; especially on information and communication channels of wards, communes, residential groups, hamlets/hamlets. Download Mr. Bui Quoc Hoan - Deputy General Director of EVNSPC reported on the electricity supply situation of the Southern region at the Conference - Photo: VGP/LT This is one of the solutions to ensure safe and reliable electricity supply, especially in this years dry season, emphasized by Mr. Bui Quoc Hoan - Deputy General Director of the Southern Power Corporation (EVNSPC) at the Southern Regional Press Briefing Conference organized by Local Department 3 - Central Propaganda and Mass Mobilization Committee. held on April 8. Proactive in managing and operating electricity supply. Mr. Bui Quoc Hoan said that in the first 3 months of the year, electricity demand in the southern provinces continued to maintain a growth trend compared to the same period in 2025, especially in industrial, service and urban areas. The commercial electricity output of the entire EVNSPC reached 17.23 billion kWh, an increase of 4.93% over the same period in 2025 according to the post-merger structure, in which some localities had high commercial output such as: Tay Ninh (up 8.20%), Ca Mau (up 6.54%), Lam Dong (up 6.03%), An Giang (up 5.87%)... From the first days of April 2026 to now, Hot sun appears with high temperatures, especially in the week from April 1 to 7, the temperature in the Eastern region is very high, in some places above 36 degrees Celsius. The intense heat leads to increased demand for electricity consumption. Maximum capacity Pmax = 11,066 MW (April 7), an increase of 10.46% over the same period in 2025; Electricity consumption on April 7, 2026 reached 220,379,552 kWh, the highest since the beginning of the year. Assessing the difficulties and challenges in electricity supply, especially in the 2026 dry season, when hot weather comes early in all three regions, combined with the impact of the war situation in the Middle East and geopolitics in the world, disrupting the supply chain and affecting energy security, EVNSPC has been focusing on implementing Drastically deploy many solutions to ensure safe, stable and reliable electricity supply to serve production, business and daily life of people in the area. Also according to Mr. Bui Quoc Hoan, EVNSPC has built 3 load growth scenarios including high plan, base plan and low growth plan. Corresponding to each option, EVNSPC has also prepared solutions to ensure electricity supply. Download Strengthening electricity inspection and repair during the peak hot season - Photo: VGP/LT To date, EVNSPC has prepared and submitted to the Peoples Committees of provinces/cities for approval the 2026 Power Supply Plan; list of important customers that need to ensure electricity supply; Electricity assurance plan in case the Southern electricity system has an imbalance between supply and demand and the national electricity system lacks power sources; consolidate the local power supply executive board. At the same time, the Provincial Power companies under EVNSPC proactively report to the National Assembly Delegation/Peoples Council, Provincial Party Committee/Peoples Committee, Department of Industry and Trade of provinces and cities to reach consensus in coordination, direction, supervision and administration; Closely coordinate with local authorities in protecting the power grid safety corridor, propaganda work and strictly handling violations according to regulations. Electricity companies regularly check the power grid to promptly detect and prevent the risk of incidents; Organize the assessment, planning and implementation of 110 kV transmission lines and substations that are important in operational management, and the 110 kV trunk link between neighboring 220 kV stations to support the transfer of load back and forth; Ensure construction investment progress, major and regular repairs of works to ensure electricity supply; Inspect and review grid areas and transformer stations that are nearly full load, full load, and overloaded, and have solutions for short, medium, and long term solutions. Download EVNSPC proactively works with large customers, mobilizing participation in the load adjustment program - Photo: VGP/LT Drastically in managing electricity load demand One of the solutions that EVNSPC pays special attention to is the drastic implementation of the Prime Ministers directives on strengthening electricity saving, especially Directive No. 10/CT-TTg dated March 30, 2026 on strengthening the implementation of electricity saving and solar power development The roof has just been issued by the Prime Minister, with the goal of striving to achieve the target of saving electricity at least 3.0% of total electricity consumption in 2026; Save at least 10% of electricity consumption during peak hot months (April, May, June, July). EVNSPCs affiliated units have strengthened propaganda and raised awareness among customers about the Electric Load Regulation (DR) program so that customers can coordinate, proactively adjust or change electricity demand when required by the power system operator, contributing to reducing peak capacity at peak hours... Up to now, the entire Total Capacity The company has signed DR participation agreements with 5,205 customers with electricity consumption of 1 million kWh/year or more, with agreed capacity reduction: Type 1 (notification).before 2 hours) is 228 MW; Type 2 (24-hour advance notice) is 528 MW. Along with that, EVNSPC proactively agreed with large industrial customers on a plan to shift consumption capacity outside the systems peak hours (2:00 p.m. - 4:00 p.m.) to off-peak hours in periods (May, June, July and November 2026) that are forecast to have high peak power risks. The agreements are researched and designed flexibly to suit the spe