📋 Tender Overview
Within the framework of its commitment to a rigorous and timely environmental evaluation, Senace approved the Second Sustaining Technical Report (ITS) of the Third Modification of the detailed Environmental Impact Study (EIA-d) of the Pucamarca Mining Unit, presented by Minsur S.A., a project located in the Tacna region.
The approval was given through Directorial Resolution No. 00028-2026-SENACE-PE/DEAR, of March 13, 2026, which grants environmental viability to the proposed modification, after verifying compliance with the technical and environmental criteria established in current regulations.
The approved ITS contemplates modifications aimed at optimizing the operational processes of the mining unit, maintaining the environmental performance conditions previously evaluated. During the evaluation process, Senace analyzed in detail the components of the project, as well as the environmental management measures proposed by the owner.
According to the evaluation, the planned actions will generate non-significant environmental impacts, for which environmental management measures have been established aimed at their prevention, control and mitigation, in accordance with the commitments assumed in the approved environmental management instruments.
About Senace
The National Environmental Certification Service for Sustainable Investments (Senace) is a specialized technical public body, attached to the Ministry of the Environment, that evaluates the environmental viability of the countrys large investment projects, with technical solidity and effective citizen participation.
For more information, write to us at comunicaciones@senace.gob.pe and follow us on Facebook, Twitter, Instagram, LinkedIn and YouTube.