📋 Tender Overview
In the department of Alto Parana, work continues on the second bridge over the Monday River, a key work that will link the districts of Presidente Franco and Los Cedrales. The initiative integrates the Eastern Metropolitan Corridor (CMDE) and aims to strengthen regional connectivity. The new structure will promote safer and more agile traffic, shortening travel times and optimizing daily circulation in this sector. In addition, it will contribute to the territorial integration and economic dynamism of the east of the country, facilitating the transportation of goods and services. Construction progress On the left bank, in Presidente Franco, the work focuses on pile No. 33 of pile 06, where load tests and grouting work were carried out, a technique that consists of the injection of fluid mortar to consolidate and strengthen the base. On the right bank, in Los Cedrales, the construction of the piers that will support the viaduct continues. For this, formwork is used and a rigorous control of levels is carried out, in order to guarantee structural stability. Likewise, the loading and pouring of concrete was carried out on piles and piles, with permanent settlement and temperature monitoring, both at the Acaray Plant and at the work front, complying with the established technical specifications. Main features The bridge will be approximately 500 meters long and 26.5 meters wide. It will have four lanes of 3.6 meters each, internal and external shoulders with New Jersey-type defenses, as well as pedestrian paths and bicycle lanes on both sides, incorporating road safety and sustainable mobility criteria. The execution is in charge of the Puente Monday Consortium, with supervision by the JYI Consortium and, being part of the CMDE, it will allow the connection with the Integration Bridge to be articulated more efficiently, consolidating a strategic corridor for transit and cargo transportation in the region. Date: February 23, 2026