📋 Tender Overview
The construction of the Bioceanic corridor benefits thousands of inhabitants of different Chaco populations, improving connectivity and access to services. In addition, it boosts the local economy by creating direct and indirect jobs in different work fronts, generating opportunities and energizing the region. Since this week, Lot 2 of the Bioceanic Corridor has recorded significant progress with the beginning of the asphalt concrete base test track. This experimental section allows the behavior of the mixture, the construction method and the compaction process to be verified in the field, ensuring that the laboratory results correspond to the real conditions before moving forward with the final execution of the portfolio. The test track was developed over a length of 240 meters and had the objective of defining the most appropriate compaction train, in addition to adjusting the dosage of the mixture and optimizing the construction procedure, guaranteeing compliance with the technical specifications of the work. During this phase, witness samples of the asphalt concrete were extracted and will be analyzed in the laboratory. Once the technical indicators have been verified, the complete execution of the asphalt concrete base in Lot 2 will begin, ensuring the durability of the road. At the same time, works are progressing on other fronts, under the responsibility of the Chaqueno del Norte Consortium, made up of Heisecke Constructora S.A., Benito Roggio e Hijos S.A. and L.T. S.A., with sustained work on lime soil, cement soil and embankment, which reaches approximately 75% progress. Connecting paths, promoting development Section 3 of the Bioceanic Corridor comprises some 224 kilometers of paving and is divided into four lots. This strategic infrastructure will link the Atlantic with the Pacific, reduce logistics times and costs, strengthen regional integration and position Paraguay as a key node for trade and transportation in South America. Date: December 18, 2025