📋 Tender Overview
As part of the improvement works of the margins of the San Lorenzo Arroyo, the Ministry of Public Works and Communications (MOPC), together with the Municipality of San Lorenzo and the contractor, will carry out a mass plantation day with about 2,000 seedlings of native species in one of the citys squares. The initiative, which responds to the socio -environmental commitment of the project, was agreed in a recent meeting between representatives of the municipality, the Team of the Coordination of Drinking Water, Sanitation and Hydraulic Works (Capsoh) of the MOPC and the Executing Company. The day is scheduled for Thursday, June 19, coinciding with Tree Day, and will be attended by local, technical and neighbors. The objective is to integrate ecological restoration actions into infrastructure work, promoting the regeneration of the urban ecosystem, the improvement of public spaces and citizen awareness about the care of the natural environment. The activity will be open to the entire community, promoting the active participation of the inhabitants in the environmental recovery process of this area of the city. Works will transform 850 meters from the urban channel The intervention on the San Lorenzo stream is part of the urban drainage master plan, aimed at mitigating floods, recovering public spaces and improving infrastructure in a sector historically vulnerable to extreme climatic events. The entrepreneurship contemplates the channeling of 850 meters of the channel, with an infrastructure that will directly benefit more than 14,000 inhabitants. The construction of an reinforced concrete channel of rectangular section is expected, with 4 meters deep and a base that expands from 11 to 15 meters along the route. All this accompanied by urban improvements in its environment, thus seeking a definitive integral solution to erosion and flood problems, combining engineering and sustainability to improve the quality of life in the district. Date: June 10, 2025