Environment and Pollution

Rwandas Key Power Tender

📄 Tender ID: 521671909 📅 Published: 16 Aug 2025

📋 Tender Overview

Floating Booms Have Been Installed On The Rusizi River To Reduce Plastic Waste That Has Been Disrupting The Operation Of Power Plants Supplying Electricity To Rwanda, Burundi, And The Democratic Republic Of Congo (Dr Congo). Plastic Pollution Is Increasingly Hindering Power Generation Along The River And Threatening Aquatic Life In Lake Kivu, Leading To Urgent Calls For Sustainable Waste Management. A Floating Boom Is A Barrier That Rests On The WaterS Surface, Designed To Contain, Control, Or Divert Floating Debris And Pollutants. Fidele Ndayisaba, Director-General Of The International Electricity Society Of The Great Lakes (Sinelac), A Specialised Institution Of The Economic Community Of The Great Lakes Countries (Cepgl), Said That 50 Mwh (Megawatt-Hours) Were Lost Annually Due To Waste In The Rusizi River. ...

🔍 Key Information

📄
Tender Reference No.
521671909
📅
Publication Date
16 Aug 2025
🌐
Sector
Environment and Pollution
📝
Notice Type
News
📍
Location
Cote divoire

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 16 Aug 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Cote divoire
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…