📋 Tender Overview
In the Bezhanitsky district on the 23rd km of the Uspenskoe - Soprygino highway the next stage of reconstruction of the bridge across the Ashevka river has been completed . The contractor Pskov Automobile Roads LLC completed the installation of the superstructure beams.In total 18 reinforced concrete beams were installed in the design position 6 pieces for each of the three bridge spans. Each beam is 15 meters long and weighs 17 tons. They are mounted on rubber-metal bearings.Recall that a new three-span reinforced concrete bridge is being built on the site of an old ferry washed away in 2013 by a rain flood. The total length of the structure will be about 50 m. The roadway will have two traffic lanes and two pedestrian walkways with railings and barriers. There will also be staircases one on each side and an exit from the Uspenskoe-Soprygino road.A total of 336 meters of roadbed highway with a bridge will be reconstructed. The customer of the works is the Department of Highways of the Pskov Region GBU PO Pskovavtodor. Funds for reconstruction in the amount of over 70 million rubles were allocated from the regional budget. The work should be completed by August 31 2021.