Bridges and Tunnels

Russian Federation Rusal Tender

📄 Tender ID: 458158208 📅 Published: 19 Nov 2020

📋 Tender Overview

RUSAL a leading global aluminium producer announces that it has constructed a new road bridge across the Samou river in the Kindia Prefecture Guinea. The bridge is now open for use for vehicles.The road bridge across the Samou river which is more than 65 meters long has been built by Compagnie des Bauxites de Kindia CBK a subsidiary of RUSAL to ensure transport accessibility to the Frifou deposit Dbl mine which will be developed to supply RUSAL with required quality raw materials in the coming years. The construction of this bridge has been completed in record time two months ahead of schedule despite all the difficulties in Guinea on the back of the COVID-19 pandemic.The design solutions and materials used to build the bridge ensure a lifespan of at least 35 years. Due to advanced engineering solutions the bridge can remain open all year round which is especially valuable in Guinea where the rainy season can last up to five months. To evacuate water in the rainy season 13 artificial culverts were embedded in the bridge structure. To increase the strength the metal parts from auxiliary structures used when constructing a berth in the port of Taressa Dian-Dian project were used in the bridge frame.When designing and constructing the bridge in addition to technical aspects close attention was also paid to its environmental impact. During the construction process the chemical and biological composition of the water in the Samou river was systematically monitored. Regular sampling and analysis was carried out during the construction process by accredited employees of the certified laboratory ONCQ National Quality Control Office confirming that the high quality of water in the Samou river and its composition have seen no impact on the back of the bridges construction and CBKs mines operations.The project has also taken into consideration the interests of local people for whom this opens new logistics opportunities. The new bridge built by RUSAL will connect remote parts of the Prefecture with the regional centre in Kindia which will create additional prospects for economic development of the region and Guinea as a whole.Commenting on the new bridge opening Yakov Itskov Head of the Alumina Business at RUSAL said Thanks to this new transport infrastructure facility CBK has received the necessary transport access to develop new sites of its deposit in Kindia alongside additional logistics opportunities which have been created for the Guinean state and local authorities to transport people and cargoes deep into the country. I am sure that the mutually beneficial nature of our cooperation with the Republic of Guinea will help to strengthen the countrys economic stance and strengthen the competitiveness of RUSAL as a leader of the global aluminium industry and one of the largest foreign investors in the Guinean economy.RUSAL has been operating in the Republic of Guinea since 2001 and is one of the largest foreign investors in the country. In Guinea RUSAL owns and operates the Compagnie des Bauxites de Kindia CBK as well as the Friguia alumina refinery. In addition RUSAL is currently implementing a large-scale project to develop the worlds largest bauxite deposit at Dian-Dian in the Bok region of Guinea. The total confirmed reserves at the Dian-Dian deposit amount to 564 mln tonnes.

🔍 Key Information

📄
Tender Reference No.
458158208
📅
Publication Date
19 Nov 2020
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
Russian federation

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 19 Nov 2020
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Russian federation
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…