Bridges and Tunnels

Russian Federation Road Tender

📄 Tender ID: 449852520 📅 Published: 19 Dec 2019

📋 Tender Overview

The construction of the first category 2 highway in the Amur Region to the international automobile bridge over the Amur River has been completed - permission has been issued for putting the facility into operation. The track was erected as part of a single project for the construction of a cross-border road bridge across the Amur River at the border between Russia and China.About 14 kilometers laid from scratch. It used to be here - a field and forest plantations - today is a modern highway that leads to the first Russia-China bridge. Work at the facility was carried out around the clock and was fully implemented in accordance with the calendar schedule of the contract said Alexander Kozlov Minister for Development of the Far East and the Arctic.The traffic will be open after the bridge itself has been commissioned and only after that the entire construction complex will be commissioned. The developer of the facility is a limited liability company for the development and construction of the Amur Heilongjiang bridge. Since December 2016 construction works were carried out by the general contractor Asphalt joint-stock company.In general the object is ready for delivery now the contact obligations with the general contractor of Asphalt JSC which carried out the construction of the entrance to the international bridge are completely completed. In the Amur Region a technical category 2 highway with reinforcing slopes with reinforced concrete slabs was built for the first time added Evgeny Korolkov head of the Amur Heilongjiang bridge development and construction company branch in Blagoveshchensk. According to the main indicators of the facilitys capacity the highway corresponds to category II has a capital type of coverage with reinforced layers of pavement designed for all types of traffic loads all categories of vehicles. The width of the embankment is 15.5 m the height of the embankment is up to 6 m the width of the carriageway is 7.5 m. Also the entrances include five bridge objects three viaducts and two structures for communication of divided territories.Recall that the first RF-PRC automobile bridge was built in December 2016 in the Amur Region. November 29 2019 the main stages of the construction of the Russian part of the bridge were completed. After the bridge is commissioned in 2020 passenger traffic will be about 5500 people per day. According to the terms of reference 630 trucks 164 buses and 68 cars will be able to drive through it every day.

🔍 Key Information

📄
Tender Reference No.
449852520
📅
Publication Date
19 Dec 2019
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
Russian federation

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 19 Dec 2019
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Russian federation
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…