📋 Tender Overview
GKU Management of highways of the Republic of Sakha Yakutia in 2020 the construction of a bridge over the Tyugyene river at 108 km of the Kobyai district was completed.The section of km 159 45 of the Kobyai highway was built and put into operation in 2003. After the water recession on this section of the road the contractors will provide temporary passage of vehicles after which work will begin on the construction of a temporary bridge crossing of the CAPM type medium road bridge 32 meters long across the Khatyn-Yuryakh River which will be put into operation in August current year.Reconstruction of the bridge over the Khatyn-Yuryakh river on the Kobyai highway is planned within the framework of the program for 2021-2023 for the reconstruction overhaul and repair of artificial structures in a pre-emergency and emergency technical condition on the existing network of regional and intermunicipal public roads. and local significance carried out with the involvement of federal budget funds. At this time the design documentation is under consideration at Glavexpertiza.