📋 Tender Overview
A new bridge was put into operation over the Keb river in the Pskov region. The artificial structure was built next to the old crossing which was constantly flooded and local residents were cut off from the network of regional and federal roads. Now there is a year-round transport connection between the villages of Yazykovo and Gnilovets gardening associations Vostok and Keb and dacha plots.The bridge was erected as part of the project for the construction of a public highway of regional importance from the federal highway Novgorod - Pskov through Soltsy Porkhov to the Keb gardening partnership. The work was carried out at the expense of the regional budget within the framework of the state program of the Pskov region Development of the transport system for 2014 - 2020. The contract for the amount of 42 million rubles was signed between GBU PO Pskovavtodor and LLC Automobile Roads of Pskov .The contractor carried out a whole range of works clearing the area from trees and bushes restoring and securing the route arranging an embankment and gravel roads. On the main course a sand drainage layer was installed geosynthetic material was laid a base layer was made of crushed stone-sand-gravel mixture and a two-layer asphalt concrete pavement.Similar work was carried out at road junctions and junctions. New asphalt pavement was laid on the headland. A new bus stop with a landing area and a car pavilion was also built here.The list of works also included the installation of edge trays water intake wellsinstallation of a side stone strengthening of roadsides road marking with paint with glass beads landscaping.The new bridge stands on two supports the superstructure consists of 5 beams. There is a sidewalk for pedestrians and people with limited mobility. In addition the bridge is now illuminated as is the bus stop. The structure meets modern requirements for carrying capacity and safety.The structure of the old ferry has been dismantled and a beach site has been prepared at the site of the old crossing.The warranty period for the bridge subgrade and top pavement is 8 years.We add that in 2021 within the framework of the national project Safe and High-Quality Roads 5 km of the road leading to the bridge from the Novgorod-Pskov federal highway will be repaired.