📋 Tender Overview
In the Omsk Region large-scale work continues to replace obsolete elevator equipment in apartment buildings. In 2020 it is planned to replace lifts in 72 apartment buildings - thats 328 new lifts. At the moment work has been completed in 37 high-rise buildings. The remaining 35 houses will be accepted by the end of the year. So in the house number 192 on Mendeleev Avenue the contractor has replaced four passenger elevators. Hoisting machines once made in Samarkand have long since exhausted their resource and have often broken down recently. Our house is 35 years old and the elevators were the same. We are satisfied with the work done. Now it is a pleasure to ride the elevator said Valentina Vysokova the head of the house.It took the contractor three months to complete all the work to replace the elevator equipment. During this time the project was developed and approved the old equipment was dismantled and new equipment installed. In addition the contractor carried out other envisaged works he replaced the metal frames of the mine doors and call buttons on each floor mounted the thresholds of the floor areas carried out cosmetic repairs in the machine rooms and installed fire doors and hatches there. The object was accepted by the commission on October 23 almost two weeks ahead of schedule.The contractors have been tasked with shortening the terms as much as possible in order to deliver as little inconvenience as possible to the owners of the premises in the building due to the inoperative elevator commented Alexander Khomin Deputy Director of the Regional Fund for Capital Repair of Apartment Buildings.The new elevators are superior to the old machines in everything and meet all safety requirements. The main emphasis is placed on energy saving elevators belong to the highest class - A. In the future this will allow the owners of premises to save money on paying for electricity for general household needs thanks to LED lighting.Over the previous years of the regional program the replacement of elevators was carried out in 210 apartment buildings with 885 units of elevator equipment 695 elevators - 169 houses on the general account 190 elevators - 41 houses on special accounts.For comparison in 2019 alone 370 lifting machines were replaced in 93 apartment buildings.