Bridges and Tunnels Infrastructure and construction

Russian Federation Construction Tender

📄 Tender ID: 456907108 📅 Published: 29 Sep 2020

📋 Tender Overview

The Prime Minister of the Russian Federation Mikhail Mishustin approved the National Program for the Socio-Economic Development of the Far East for the period up to 2024 and for the future until 2035. Among other points the document indicates the construction of an automobile bridge across the Lena in the area of the city of Yakutsk reports YASIA.Acceleration of the socio-economic development of the Republic of Sakha Yakutia according to the text of the program will be carried out through a variety of measures previously announced more than once and in part already being implemented by the leadership of the region.In the area of infrastructure development until 2024 inclusive acceleration will be carried out through the construction of a bridge over the Lena River in the area of the city of Yakutsk the strategic document states.Other items include reaching the design capacity of the mining and processing plant at the Denisovskoye coal deposit 2025 the mining and processing plant at the Inaglinsky coal deposit 2024 the mining and processing plant at the Nezhdaninsky gold deposit 2025 the mining enterprise at the Tomtor niobium deposit 2024 construction of the Elga coal complex 2025 construction of the Zhatay shipyard 2025 construction of a cargo terminal in the village. Nizhniy Bestyakh 2025 and others. The full list of measures can be found in the text of the National Strategy.The bridge across the Lena should go from the village of Staraya Tabaga part of the Yakutsk urban district to the village of Khaptagai in the Megino-Kangalassky ulus. It will make it possible to create a transport and logistics hub in Yakutsk where several federal routes will converge railway river and aviation as well as federal highways Vilyui Lena and Kolyma. The opening of the bridge is expected to triple the regions freight traffic - up to 6 million tons per year.According to preliminary estimates the total length of the three-pylon two-lane cable-stayed bridge will exceed 3 km and the length of approaches will be about 11 km. The winner of the tender for the construction of the project was the consortium of the VIS group and RT - business development a subsidiary of the Rostec state corporation - the National Infrastructure Company. The exact amount of capital expenditures will be determined based on the results of the design and passing the federal state expertise. Extra-budgetary funds may amount to about 30 billion rubles. The development of design estimates for the concession project takes place in two stages. The first stage of preparation of the construction site will be completed at the end of September this year and will be submitted to Glavgosexpertiza for consideration in December.In December of this year an examination will be received for the first stage of design and estimate documentation for the Bridge over the Lena River in the area of Yakutsk. All the necessary geodetic hydrometeorological ecological transport surveys have been carried out. Work is underway to agree on the documentation for the planning of the territory redemption and lease of land plots falling under the construction of a bridge crossing the exclusion of lands from the status of City Forests the elimination of garbage accumulations in the Staraya Tabagi area.

🔍 Key Information

📄
Tender Reference No.
456907108
📅
Publication Date
29 Sep 2020
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
Russian federation

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 29 Sep 2020
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Russian federation
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…