📋 Tender Overview
The construction of a bridge over the Lena River is proceeding according to the project. This was stated by the head of the republic Aisen Nikolaev during a live broadcast with bloggers on Instagram. The question was asked by the traveler and video blogger Bogdan Bulychev reports YASIA.We hope and even are confident that 2021 will go down in history as the year of the beginning of the practical construction of the bridge across the Lena. This is a huge construction site both roads and the bridge itself should be built there said Aisen Nikolaev.Recall that on December 25 acting First Deputy Prime Minister of Yakutia Dmitry Berdnikov held a regular meeting of the working group on the construction of the Lena Bridge. At the meeting in particular the issues of accounting for the hydrological and ice conditions of the Lena River and the technical feasibility of building and operating a cable-stayed bridge in the natural and climatic conditions of Yakutia were discussed.Dmitry Berdnikov stressed that these aspects are very important in the construction of the bridge. He noted that the Yakutians are especially worried about the questions will the bridge support interfere with the ice drift will they withstand the ice load and what kind of cable will the cables beFor the analysis assessment of these risks and modeling the design institute attracted high-class specialists.Traveler and video blogger Bogdan Bulychev has been to Yakutia more than once including as part of the Arctic expedition and is the author of the PRO TRAVEL channel Bogdan Bulychev.