📋 Tender Overview
Pskov City Administration Department and StroyBaltProekt LLC signed a contract for overhaul of the bridge across the Milevka River in the alignment of Gremyachaya Street. The contract price is about 28 million rubles. Funds for the work were allocated from the regional budget.The contractor will clear the area of trees and bushes and dismantle the existing bridge. The new bridge will stand on two supports the superstructure will be made of a reinforced concrete slab.On the approaches to the bridge the old pavement will be dismantled and the roadbed will be installed. Road clothes will consist of geosynthetic material an underlay of sand a base layer of crushed stone-sand mixture two layers of asphalt concrete pavement. The sides will be strengthened by sowing grasses.In addition the contractor will perform joining with the existing surface of Gremyachaya Street. A geogrid and a layer of dense asphalt concrete mixture will be laid at the junction areas.The statement also provides for a drainage device from the roadway sidewalks tactile tiles curb stones road markings with thermoplastic.The warranty period for the top layer of the coating is 4 years the side stone is 2 years the thermoplastic markings are 1 year.The length of the object being repaired is 91 meters bridge with approaches. According to the contract the deadline for the completion of the overhaul is November 30 2021. Now the bridge is open only for pedestrians following the results of major repairs on the bridge bed automobile traffic will be opened.