📋 Tender Overview
A bridge across the Kebtsa river in the Pskov region was put into operation after major repairs. The reinforced concrete structure was built on the 25th km of the Podborovye - Lopatovo - Borovichi highway in 1978 and did not meet modern safety requirements. The sand and gravel surface at the approaches to the bridge was also in an unsatisfactory condition . In this regard within the framework of the State program of the Pskov region Development of the transport system for 2014 - 2020 design documentation was developed for the overhaul of the structure and a section of the road with a total length of 476 meters.Works under the contract with GBU PO Pskovavtodor were carried out by Pskov Automobile Roads LLC . After the overhaul the length of the bridge is 33 meters. The superstructure consists of 5 reinforced concrete beams. The roadway is made of asphalt concrete has two lanes sidewalks on both sides a barrier and railings. The repaired section of the road now has an asphalt concrete surface. Thus the transport and operational state of the object has been restored and the safe movement of both cars and pedestrians has been ensured.The cost of the work was 50.9 million rubles. The funds were allocated from the regional budget.We add that the regional road Podborovye - Lopatovo - Borovichi belongs to the IV technical category passes through the territory of the Pskov and Porkhovsky regions and connects the Toroshinsky Karamyshevsky volosts of the Pskov region and the Dubrovensky volost of the Porkhovsky region.