Infrastructure and construction

Roadway Activity Report Tender

📄 Tender ID: 524904878 📅 Published: 10 Nov 2025

📋 Tender Overview

Friday, November 07, 2025 | 03:50pm BLEDSOE COUNTY SR-30 and SR-443, the grading, drainage, stream relocation, widening, and resurfacing on Summer City Road: The contractor will be performing grade work and widening on Summer City Road in Bledsoe County. This work will narrow the lanes at LM 2.0 and LM 4.3 and will leave both lanes open to traffic. Please slow down and use caution when driving through the work zone. [Rogers Group, Inc./Dunlap/CNY153] BRADLEY COUNTY SR-40 [5.1-9.7] from Lyles Rd. to Bradley-Polk County Line resurfacing: During this reporting period, the contractor will continue resurfacing work on SR-40. Temporary lane closures will be necessary during daytime hours on weekdays while work is performed. Motorists should use caution when traveling through the work zone and be aware of equipment in the area. [APAC - Atlantic, Inc./Cleveland/CNZ020] BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period, the contractor will perform punch list work on SR-60 in Bradley County. Intermittent lane closures may be necessary while work occurs. [Summers-Taylor, Inc./Cleveland/CNV130] BRADLEY COUNTY SR-74 [11.445-11.83] from Whaley Road to SR-60 APD-40 drainage improvements: During this reporting period, the contractor will continue grading work on SR-74. Intermittent flagging operations and shoulder closures will be necessary periodically. Motorists should use caution and reduce speed when traveling through the work zone. [APAC - Atlantic, Inc./Cleveland/CNZ243] CAMPBELL, COFFEE, DAVIDSON, DICKSON, GILES, GREENE, HAYWOOD, KNOX, MCMINN, SHELBY, AND WILLIAMSON COUNTY. The installation of Weigh-in-Motion technology at 28 sites on various Interstate and State Routes: No Region 2 Lane Closures this week on CNX913. [Davis H. Elliot Construction Company, Inc./Maint - R2/CNX913] CANNON COUNTY SR-281 [0-4.51] from SR-53 to Todd Rd resurfacing: The contractor will have lane closures during daylight hours as needed from 5 AM to 9 PM for punch list and project wrap-up operations as needed. Flaggers will be present during the lane closure operations, and at least one lane will remain open at all times. [Rogers Group, Inc./McMinnville/CNZ066] COFFEE COUNTY I-24 (MM 117) construction of an overpass carrying Wattendorf Memorial Highway/AEDC Road, including grading, drainage, retaining walls, and paving: Drivers can expect short-term flagging operations for trucks entering and exiting the work zone on Wattendorf Highway. Please use caution when traveling through the work zone. [Jones Bros. Contractors, LLC/Tullahoma/CNZ029] COFFEE COUNTY I-24 TDOT Bridge Maintenance westbound at MM 100.2: Bridge Repair operations will be conducted on 11/05/2025 from 8 PM to 2 AM and on 11/06/2025 from 8 PM to 2 AM with a lane closure. A rolling roadblock will be used to set up and take down the traffic control. THP will be used as motorists travel throughout the area. COFFEE COUNTY SR-2 (US-41) TDOT Contractor both directions from LM 14.18 to LM 14.4: There will be a mobile traffic control operation as the TDOT contractor will be taking survey grades in the Sanitary and Storm Drains in this area. This will occur on Thursday and Friday, and possibly Monday and Tuesday the following week, from 9 AM - 3 PM. COFFEE COUNTY SR-55 (MCMINNVILLE HWY.) TDOT Contractor both directions from LM 14.6 to LM 15.00: There will be a mobile traffic control operation as the TDOT contractor will be taking survey grades in the Sanitary and Storm Drains in this area. This will occur on Thursday and Friday and possibly Monday and Tuesday the following week, from 9 AM - 3 PM. COFFEE COUNTY SR-55 construction from First Avenue (LM 2.0) to SR-16 (US-41A, N. Jackson St, LM 2.6) in Tullahoma: Phase 1 of roadway widening and bridge replacement on SR-55 (Wilson Ave.) will continue this week. The contractor may use temporary lane shifts to complete storm structure installations. Phase 1 traffic shift has reduced lanes from 3 to 2 from Cedar Lane to near Grau Lane in order to continue bridge replacement and storm drainage work. [Dement Construction Company, LLC/Tullahoma/CNX912] COFFEE COUNTY SR-55 repair of the bridge over the Little Duck River (LM 14.0): Lanes are reduced to one lane in each direction across the SR-55 bridge over the Little Duck River for bridge repair work. This lane reduction will be in place until work is complete in Fall 2025. [Mid-State Construction Company, Inc./Tullahoma/CNX412] CUMBERLAND COUNTY SR-24 [15.056-15.56] from Crossville city limits to Seventh-Day Adventist Church and School bridge replacement: The contractor will be installing signs and beginning general clearing of the project outside of the roadway. Activities may require temporary lane closures and/or traffic stoppages on SR-24 to move equipment. [Mid-State Construction Company, Inc./Crossville/CNZ206] CUMBERLAND COUNTY SR-28 (US-127 S.) Utility Work both directions from LM 0.44 to LM 5.94: Northbound and Southbound Lane closures on SR-28 (HWY 127 S.) between Lowes Gap Rd. and Willard Brown Rd. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 10/30/25 through 02/25/2026 from 9 am - 2 pm. [2025-659] CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): The contractor continues grading activities throughout the project limits. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. The contractor has scheduled paving operations beginning on the north end of the project on the proposed alignment. The contractor has closed North Grace Hill Drive at the existing intersection of SR-28 (US-127) for construction activities. Motorists should utilize South Grace Hill Drive as the detour with appropriate signs. Traffic has been moved to temporary alignment on Plateau Road and permanent alignment on Potato F

🔍 Key Information

📄
Tender Reference No.
524904878
📅
Publication Date
10 Nov 2025
🌐
Sector
Infrastructure and construction
📝
Notice Type
News
📍
Location
United states

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 10 Nov 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country United states
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…