📋 Tender Overview
The maintenance and improvement work of rural roads in the departments of Misiones and Neembucu continues, with interventions covered by platform, bump and formation of gutters in strategic points of the south of the country. These actions are promoted by the Ministry of Public Works and Communications (MOPC) through its operational districts No. 8 and No. 12, in coordination with local and departmental governments, to guarantee the transitability of land roads. In Neembucu, the work began on Monday, June 2 with the Ripio Platform Profile in the Pilar-Boqueron section, a key route for regional connectivity. Previamente, el jueves 29 de mayo, se ejecutaron tareas similares en el tramo Desmochados-Villalbin. Simultaneously, District No. 8 of Misiones advances with bumpy and profiled on the Panchito Lopez-Yabebyry route, and in the Santa Maria-San Antonio Parakau section, where it is also made conformation of gutters. These improvements integrate the maintenance plan for neighborhood and departmental roads, aimed at ensuring a more efficient, safe and resilient road infrastructure for the most vulnerable localities. Fecha: 3 de junio de 2025