Railways

Rfi Veneto Construction Tender

📄 Tender ID: 518588269 📅 Published: 31 May 2025

📋 Tender Overview

Venice, 30 May 2025 Also For The Summer 2025, Italian Railway Network (Fs Italian Group) Continues The Activities Of Strengthening The Railway Network In Veneto. The Interventions, Fundamental To Improve The Punctuality, Regularity And Reliability Of The Service, As Well As To Increase The Performance Of The Lines, In Some Cases Involve The Need To Temporarily Interrupt The Railway Circulation. The Periods Of Intervention Were Planned To Minimize Inconveniences For Travelers. Below Is The Detail Of The Main Interruptions Expected: Verona - Vicenza Line: The Railway Circulation Will Be Interrupted From 4 To 25 August 2025 To Allow The Progress Of The Extraordinary Maintenance And Infrastructure And Technological Strengthening Works Connected To The Construction Of The New Av/Ac Verona - Vicenza Line, As Part Of The Verona - Vicenza Bivio (Financed With Pnrr Funds) And The Lot Crossing . The Montebello Vicentino Stop Will Inhibit The Traveler Service From 24 June To 7 September 2025 And The Lonigo Stop Will Inhibit The Traveler Service From 24 June To 24 August 2025. Economic Investment: 8 Million Euros. Vicenza - Schio: A Schio, Villaverla And Cavazzale, From 4 To 25 August 2025, Will Take Place Renewal Of The Deviatei, In Conjunction With The Interruption Of The Verona - Vicenza Line. Similar Processes Will Also Take Place In Thiene, Where The Works Will Extend Until 30 September 2025 (From 25 August To 30 September In Night Interruption). During The Interruption, The Renewal Of The Safety Plant For The Distancing Of The Trains Between Thiene And Schio And Between Thiene And Dueville, As Well As The Extraordinary Maintenance Of The Railway Headquarters Will Also Be Performed. Economic Investment: 2 Million Euros. Calalzo Line-Padua (Longarone-Zoldo Station): The Redevelopment Works Of The Longarone-Zoldo Station-Intervention Co-Financed By The Olympics Decree For The Milan-Cortina 2026 Olympic And Paralympic Games-Include Sidewalks, Underpasses And Canopies. From 15 June To 13 September, Track Ii Will Be Interrupted, With The Limitation Of The Entire Trains To The Sidewalk 1; From 14 September To 13 December, However, Both Tracks I And Ii Will Be Interrupted. Economic Investment: 12 Million Euros. During This Period, Extraordinary Maintenance Interventions Will Be Carried Out On The Whole Bridge In The Alps-Calalzo. The Interruption Of The Line For These Activities Makes It Possible, In Parallel, The Start And The Realization Of The Redevelopment Interventions Within The Station Optimizing Times And Resources. Mantua - Monselice / Verona - Rovigo Line: In The Stretch Between Isola Della Scala, Cerea And Legnago, The Railway Circulation Will Be Interrupted From 7 To 13 June 2025 To Allow The Renewal Of The Deviatei. During This Period Of Suspension Of Railway Traffic Between Isola Della Scala And Rovigo, Other Interventions Will Also Be Carried Out: The Extraordinary Maintenance Of The Railway Headquarters Will Also Be Provided, The Re -Fragraction Of The Roadway In Correspondence With A Level Crossing Located Near Bovolone (Vr), The Start Of The Works For The Construction Of The Replacement Work In View Of The Future Disposal Of The Level Crossing Near Cerea (Vr) And The Consolidation Of The Provincial Road In Fratta Polesine (Ro). In Parallel, During The Non -Continuous Interruption Of The Railway Circulation Between Mantua And Nogara, Further Works Will Be Carried Out: The Extraordinary Maintenance Of The Railway Headquarters Will Be Carried Out, A Device Will Be Installed For The Increase In Safety At The Level Crossing Near Mantua And, By The Municipality Of Mantua, Two New Underpasses Will Be Built, Located Within The Municipality Itself. Economic Investment: 1.7 Million Euros. Montebelluna Line - Treviso (Treviso Centrale Station): From 16 June To 12 September 2025, In The Time Slot 8.30 - 17.30, From Monday To Friday, Track 1 Of The Treviso Centrale Station Will Be Interrupted To Allow The Renewal Of The Shelter. The Intervention, Which Provides For An Investment Of 1 Million Euros, Is Part Of A Larger Infrastructure Strengthening Program Of The Line, Which Also Includes Renewal Activities Of The Railway Armination. These Works, Carried Out In A Coordinated But Not Promiscuous Way, Allow To Optimize The Use Of The Planned Interruption, While Improving The Safety, Reliability And Overall Quality Of The Railway Service. Further Information On The Railway Traffic Measures And On The Trains Concerned Will Be Available On The Rfi Website, On The Digital Channels Of Railway Companies Or At Customer Support Staff And Ticket Offices.

🔍 Key Information

📄
Tender Reference No.
518588269
📅
Publication Date
31 May 2025
🌐
Sector
Railways
📝
Notice Type
News
📍
Location
Italy

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 31 May 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Italy
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…