📋 Tender Overview
- Interested Treat Olbia - Golfo Degli Aranci - Adjustment To Stations A Standard Interoperability - Works Against Hydrogeological Instability Cagliari, 30 September 2025 Italian Railway Network (Fs Group) Will Perform, From 1 October 2025 To 31 January 2026, Extraordinary Maintenance Works And Infrastructure Enhancement That Will Involve A Line Interruption In The Strokes Between The Stations Of Olbia And Golfo Aranci. In Fact, Excavation Interventions Continue In The Olbia Station For The Improvement Of Accessibility To The Airport With The Creation Of A New Underpass Of The Passing Station In Front Of Basilica Of San Simplicio. The Intervention Also Provides For The Realization Of 55 Cm High Sidewalks (European Interoperability Standard), To Facilitate The Climb And Descent From The Trains, Of New Canopies At The Service Of The Tracks And The Redevelopment And Enhancement Of The Travelers, Accessory Buildings And External Areas. At The Same Time, The Accessibility Interventions For The Redevelopment And Enhancement Of The Rudalza Stops, Cala Sabina And Marinella Will Start, And The Golfo Aranci Station, Placed Along The Olbia - Golfo Aranci Line, Which Provide, Also In This Case, The Adaptation Of The Sidewalks To The European Interoperability Standards. The Interventions Are Part Of The Strategy Of The Italian Railway Network Aimed At The Development Of Stations Such As Intermodal Hubs And Service Poles, With Redevelopment And Infrastructure Adaptation Distributed In The Coming Years As Part Of The Integrated Stations That Concerns The Main Italian Airports. Taking Advantage Of The Absence Of Railway Circulation, The Mitigation Interventions Of The Risk Of Hydrogeological Instability Will Continue On The Sections Between Olbia And Golfo Aranci With Replacement And Installation Of Paramassi Networks.