📋 Tender Overview
From 10 May To 29 June Total Investment Of Approximately 60 Million Euros Naples, 30 April 2026 Technological Upgrade Interventions Continue On The Main Railway Lines In Campania. In The Period From 10 May To 29 June Rete Ferroviaria Italiana (Fs Italiane Group) Will Carry Out Important Works On The Historic Naples - Salerno Line, Via Cava De Tirreni, Preparatory To The Installation Of The Ertms (European Rail Transport Management System), The Most Advanced Technological System For The Supervision And Control Of Train Spacing. The Technology, Already In Use On High-Speed Lines, Will Improve The Performance Of The Infrastructure In Terms Of Regularity, Quality And Management Of Railway Traffic, Also Allowing Savings On Management And Maintenance Costs Compared To Traditional Signaling Systems. There Will Be Hydrogeological Risk Mitigation Interventions At The Trench In The Municipality Of Torre Annunziata; Safety Works And Conservative Restoration Of Walls Near The Granatello Port; Renewal Of Switches In The Pompeii And Santa Maria La Bruna Stations. In Total, Over 100 People Per Day Will Be Employed On The Construction Sites, Including Rfi Employees, Fs Engineering And Contracting Companies, For A Total Economic Investment Of Approximately 60 Million Euros, Also Financed With Pnrr Funds. Therefore, To Allow The Full Operation Of The Construction Sites, Railway Circulation Will Be Suspended From 10 May To 29 June Between The Stations Of San Giovanni-Barra And Salerno, With Consequent Changes To The Circulation Program Of Long-Distance, Regional And Metropolitan Trains. Further Details On The Measures Will Be Available On The Sales Channels Of Railway Companies.