📋 Tender Overview
From 18 August To 13 September Genoa, 12 August 2026, The Italian Railway Network Continues The Extraordinary Maintenance, Renewal And Strengthening Plan Of The Genoa-Ovada-Acqui Terme/Alessandria Railway Line, With A Concentrated And Continuous Program Of Interventions From Tuesday 18 August And Sunday 13 September. To Allow Construction Activities Between Acqui Terme-Prasco-Ovada From And On The Ovada-Genoa Borzoli Section, It Will Be Necessary To Suspend Rail Circulation Between Genoa And Acqui Terme. The Activities Mainly Concern The New Artificial Mele Tunnel, Between The Mele Station And The Entrance To The Turchino Tunnel, Aimed At Making The Infrastructure Safe In An Area Affected By Landslides. During The Interruption, Consolidation Works Will Also Be Carried Out In The Ciso And Cantalupo Tunnels, Interventions On The Railway Superstructure, The Renewal Of The Track On The Orbregno Metal Girder And Inspections On Bridges And Viaducts Along The Ovada-Acqui Terme Route. The Program Also Includes Hydraulic And Hydrogeological Risk Prevention Activities, Maintenance Of Rockfall Barriers And Interventions On Technological Systems, Including The Electricity Supply Line Between Ovada And Prasco And The Signaling Systems In The Prasco And Genova Borzoli Stations. The Interventions Will Be Carried Out Continuously And Both During The Day And At Night, The Period Has Been Identified With The Aim Of Minimizing The Impact On Travelers As Much As Possible By Not Interfering With The Flows Of School Commuters With Inconvenience To A Smaller Number Of Travelers On The Home - Work Route Compared To The Winter Periods. More Information On The Website Www.Rfi.It.