📋 Tender Overview
Over 100 Million Euros * Over 100 Technicians, Night And Day Bari, 5 August 2025 At Full Speed, The Infrastructure And Technological Enhancement Interventions Of The Italian Railway Network (Fs Group) On The Bari Line - Taranto Are Continued For About 90 Million Euros. Over One Hundred Technicians Are At Work, Night And Day, To Carry Out The Preparatory Works For The Activation Of The System, In The Bari Nord - Gioia Del Colle Section, The Renewal Of The Tracks Between The Gioia Del Colle And Grottalupara And The Interventions For The Improvement Of Accessibility In The Acquaviva Of The Sources. Ertms The Preparatory Activities Of The Construction Site At This Stage Affect The Bari Parco Nord - Gioia Del Colle Section, For About 50 Kilometers. The Installation Of This New Technological System On The Bari Nord - Gioia Del Colle Section Is Part Of The National Recovery And Resilience Plan. Once Activated Throughout The Bari-Taranto Line, The System Will Determine An Improvement In The Regularity Of The Circulation And Quality Of The Service. In Particular, They Will Have: Greater Infrastructure Reliability, Greater Flexibility In Traffic Management, An Increase In The Speed Allowed By Regulatory Constraints Linked To Technological Systems And Lower Times For Maintenance. Renewal Of Tracks And Deviatei Between The Stations Of Gioia Del Colle And Grottalupara Are Underway The Renewal Of The Tracks With Replacement Of Rails And Traverses And Restoration Of The Massive Railway, For About 25 Kilometers. The Activities Include The Complete Renewal Of 13 Deviatei In The Two Stations. Redquation Of The Acquaviva Of The Sources, The Ongoing Interventions Are Financed With Pnrr Funds And Concern The Improvement Of Accessibility With The Reduction Of Architectural Barriers, The Raising Of The First Sidewalk, Repaid And Equipped With Tactile Paths, The Expansion Of The Second Sidewalk, Repaired And Also Equipped With Tactile Routes And Two Lifts In The Service Of The Sidewalks 1 And 2. Stairs. The Redevelopment Of The Canopies And The Restyling Of The Existing Underpass That Leads To The Second Front, Side Of Viale Saturno. Here A New Access With Shelter Will Be Made To Cover The New Stairs And An Elevator Will Be Inserted. For The Station Building There Is A Complete Restyling With Structural Interventions Of Seismic Improvement And The Refunctionalization Of The Internal Spaces. Interventions Are Also Planned On The Main Prospectus With A New Canopy. The External Square Will Have An Area Dedicated To Pedestrianization, Stalls For Kiss & Ride, For People With Reduced Mobility And For Local Public Transport. The Lighting System And Furnishings Will Also Be Renewed. The Redevelopment Interventions Of The Taranto Station Continue The Construction Site Improvement Of Accessibility With The Raising Of The Sidewalks, The Flooring, The Restyling Of The Shelters And The Insertion Of The Lifts On The 3 And 4 Sidewalks Is Underway. Completed The Interventions On The Polfer Building. The Seismic Improvement And Restoration Of The Travelers Were Started, In Compliance With The Historical-Artistic Peculiarities Of The Building And In Accordance With The Indications Of The Superintendency.