📋 Tender Overview
Companies that fail to comply with this obligation could face fines of between 5 and 20 UITOn March 14, 2026, the deadline for removing overhead electricity wiring that is disused or in poor condition in urban areas expires, in accordance with the provisions of Law No. 31595 and its regulations. This was recalled by the Environmental Assessment and Control Agency (OEFA), an entity attached to the Ministry of the Environment.
The OEFA specified that it is the entity in charge of supervising the removal of disused or damaged electrical wiring. Meanwhile, the control of telecommunications wiring is the responsibility of the Ministry of Transportation and Communications (MTC).
In accordance with current regulations, companies that identify the presence of electrical wiring that is disused or in poor condition must present an Action Plan that includes the schedule for its removal.
However, the OEFA has been carrying out supervision actions on electrical distribution companies with the objective of verifying in the field the information reported by the companies regarding the non-existence of disused or deteriorated overhead wiring in urban areas.
If wiring is detected in disuse or in poor condition during the supervisions, the OEFA may recommend the initiation of administrative sanctioning procedures, as well as arrange administrative measures to ensure its removal. According to the current regulatory framework, failure to comply with this obligation could generate fines ranging from 5 to 20 tax units (UIT).
Finally, the OEFA urges the concessionaire companies of the public electricity service to comply with the provisions of current regulations, in order to reduce risks for the population and contribute to safety in urban areas.