📋 Tender Overview
By improving road safety, the Sigulda center has been rebuilt on the Inciems -Sigulda -Kegums (P8) regional road, which is Rainis and Ausekla Street in the city, from the intersection with Cesu Street to the railway crossing (12.50-13.96 km). The road is rebuilt using solutions adapted to the urban environment, including the pavement used by cobblestone infrastructure for pedestrians and cyclists. Usually the LVC builds roads outside populated areas, but here were different solutions adapted to the urban environment, which requires other approaches and changes from us to our colleagues engineering approach. In that sense, this was a challenge for us, said Martins Lazdovskis. He also thanked all parties involved in the project for their cooperation. The project was created in cooperation with the Ministry of Smart Administration and Regional Development (MEPRD) and funded by the European Union (EU) recovery and resilience mechanism (AnM). As part of this, the municipality has also done a number of work, making it even more attractive to the surroundings, planning and implementing a greenery program. Traffic safety is our common priority, and this project is another proof that we achieve good results, all parties - ministries, municipality and project promoters in a constructive cooperation. I am pleased that the optimal solution for smaller protected road users has been found and I would like to congratulate VSIA for a different, Dubkevich. The chairman of SIA Sandis Zvidrins, who is also a resident of Sigulda County, pointed out that the construction object in Sigulda has succeeded in wonderful and beautiful and that it was quite difficult. We started the work last year on Ausekla Street. At first, the local homeowners were worried - as it would be here. But they realized it was a project for them! There were different challenges for them! There will be a competitor in the autumn, because in the city center, autumn is beautiful, he said. Janis Vimba, Chairman of Sigulda County Council, emphasized that the road means both practical convenience and a symbolic direction - a new beginning, direction and opportunity. The rebuilt road, which is also in the center of the street in the center of Sigulda, will not only make the traffic safer and more comfortable for residents and guests, and it is also a step in the future of our region - in a targeted, well -appealed and attractive environment, he said and thanked the Ministry of Transport, VSIA, the builder and everyone involved in the project. Construction work in Sigulda was started in July last year, during which the road was rebuilt and asphalt pavement was built. Traffic safety improvements at intersections: Rainis and Ausekla Street (P8) intersection rebuilt by rotation circle; It is forbidden from Ausekla Street (P8) to turn left to Pils Street. Pils Street can be reached by leaving Rainis / Ausekla Street rotation circle and then turning in the right direction; The intersection of Rainis (P8), Castle, Janis Cakste and Oskara Kalpaka Streets has been rebuilt into a single -line rotation circle. The selected solution has also made it possible to protect the Pils Street Oak Avenue as much as possible; In the direction of Turaida Rainis (P8) and Cesu Street, the left turn from Gaujas Street to Cesu Street is prohibited. Instead, the new Rainis (P8), Castle, Janis Cakste and Oskars Kalpaka Street rotation circle must be used in the right direction. The infrastructure for vulnerable road users is built on both sides of the road and is connected to the existing municipal infrastructure in Riga, Raina Street (P8) and Pils Street. According to the concept of the public outdoor space of Sigulda, the roads of pedestrians and cyclists, as well as the intersection of Rainis and Ausekla Streets in the Rotation Circle, has a pavement. Energy efficient LED lighting is built throughout the stage, as well as rainwater sewerage, connecting it to the citys rain sewerage networks. Construction work was carried out by SIA for the contract price 4 717 192.93 euros (with VAT). This section of the regional road Inciems -Sigulda -Kegums (P8) is included in the Road Repair Program developed within the administrative -territorial reform of the Smart Administration and Regional Development (MEPRD) and is co -financed by the EU Recovery Fund (AF). Construction supervision was provided by SIA, the author of the project is SIA. This project concluded a tripartite agreement with Sigulda County Municipality, and a water supply and municipal sewerage network, power supply cable, as well as planting new trees/shrubs and ornamental plants were built as municipal funds.