📋 Tender Overview
In Talsi County, the Valdgale -Roja (P126) section of the Valdgale -Roja (P126) begins from Valdemarpils to Rude (10.09-26.86 km). The works are scheduled to be completed in the fall of 2026. Currently, the speed limit is 70 and 50 km/h, and later in seven steps will introduce the reverse movement with traffic lights and will have to take into account the extra time for the road. During the construction work, the road will be rebuilt at the almost 17 km long section and two layers of asphalt concrete will be installed. About 200 m section in a swampy area near the Mazroja culvert will build concrete piles on an average of 7 m depths to reinforce the road structure. The pavement will be rebuilt from Rudes, and the works will also take place on both bridges over the Roja River: the bridge in Lube (19.83 km) will be demolished and instead build a new reinforced concrete structure bridge. Traffic during the construction work will be on the temporary bridge; The bridge will be restored (26.35 km) to reinforced concrete structures, installing new handrails. The Mazroja River Culk (12.52 km) will be rebuilt - the old culverts will demolish and build a new one. A temporary culvert and a local bypass will be built next to the place to go around. To improve the water feedback, the entire facility will clean and clean the ditches, restore and rebuild the culverts under the road and in the exit. Closed rainwater drainage will also be built. The road compartment lane will be released from the overgrowth of trees and shrubs. In order to implement the project solutions and improve road safety, 160 trees will be cut off in the P126 compartment lane. Talsi municipalities have been permitted for tree felling. Improving the safety of vulnerable road users will build a 1.2 km sidewalk and lighting 1.6 km in Rude and 200 m in the Anuzi. From Rudem to Valdemarpils, all stops, as well as road equipment, will also be restored and the horizontal designation of the road will end. The works are carried out by SIA for the contract price 13 526 434.74 euros (with VAT), the construction supervision is provided by SIA. The author of the project is SIA. This regional P126 is included in the Road Repair Program developed within the administrative -territorial reform of the Smart Administration and Regional Development (MEPRD), and the works are co -financed from the European Union (EU) Recovery Fund (AF). In order to cut trees along the road, the VSIA must obtain permission from the municipality with the road in which the road is located. This is determined by Cabinet Regulation No. 309 for tree felling outside the forest. The municipality shall decide on additional specialists, such as the attraction of the Nature Conservation Agency or Arborist, as well as the organization of public oppression. It evaluates the arguments provided by all parties and either coordinates or does not coordinate the tree felling accordingly. Information prepared by VSIA Communication Part