π Tender Overview
10/08/2026
Special equipment undergoes seasonal maintenance - already in September its readiness exceeded 90%.Anti-icing materials and reagents are purchased, drivers and machinists are given instructions on working in conditions of low temperatures and snow drifts. Readiness certificates for heat sources and consumers of thermal energy are issued.4.4 thousand linear meters of heating networks, 47 boiler houses were repaired, and more than 12 thousand cable power lines were brought into compliance with regulatory requirements (100% of the plan).A reserve of heating oil has been created. To combat ice for the entire winter period, the need for sand-salt mixture and industrial salt is 252.6 thousand tons. By October 15, at least 126.3 thousand tons will be prepared - half the volume.At the same time, reserves of materials for patching repairs in winter conditions, as well as sand and crushed stone, will be formed. Deputy Head of the Department of Scientific and Technical Policy and Informatization of the Ministry of Transport Pavel Brechko noted: The dynamics of the work being carried out allows us to declare the readiness of the transport complex for the autumn-winter period.Until November 1, training will be held to monitor the readiness of forces and means for emergency situations typical forautumn-winter period.The exercises of the Ministry of Transport and the Ministry of Emergency Situations are based on real situations: falling trees, broken power lines, skids.They involve the duty and dispatch services of organizations, the central office of the Ministry of Transport and the Ministry of Emergency Situations - the entire response cycle is traced. The Ministry of Transport has created an industry reserve of funds for emergency response (sleepers, turnouts, traffic lights, communication cables, relay cabinets, wires, etc.), and purchased diesel generator sets.