📋 Tender Overview
At 14:16 pm on April 23, a fleeting incident occurred on the 500kV Vinh Tan (Binh Thuan) - Tan Uyen (Binh Duong). The 500kV Vinh Tan-Tan Uyen-Nhanh: EVNNPT is then trying this line and then causes an excess of the grid to overtook the voltage of some areas. Immediately after the incident occurred, the National Electricity and Electricity System Operating Company Limited (NSMO) in collaboration with operating units of the National Power Transmission Corporation and some electricity units have quickly overcome. Lien surrounding the transmission electrical system has been brought back to normal operation, not recorded damage to the device. Most of the affected loads have been restored for about 15 minutes. All