Environment and Pollution

Quang Tri Successful Tender

📄 Tender ID: 522263058 📅 Published: 01 Sep 2025

📋 Tender Overview

On the afternoon of August 30, Quang Tri Provincial Police force coordinated to urgently deploy 5 people trapped in the flood area in Hieu Giang commune, after more than 4 hours of fighting with the fast water. The provincial police force overcame the flood to rescue the people at noon on the same day, the police of Huong Hiep commune received an emergency news from relatives of 5 people working to work in the Melaleuca forest in Thuong Lam village (Hieu Giang commune) trapped due to the suddenly rising flood water, completely dividing the roads back. These people held nearly 2 days in the middle of the isolated area, the food was exhausted, the life was seriously threatened. Using boats, 25 soldiers have overcome the flood waters, approach the scene in extreme weather conditions. After more than 4 hours of effort, the force has approached and successfully rescued all 5 people (including Ho Hoan, born in 1982, Ho Van Minh, born in 1987, Ho Van Diep was born in 2002, residing in Huong Linh; Ho Van Thuc was born in 1989 and Ho Van Linh born in 1999). After more than 4 hours of efforts with 25 officers and soldiers, the force has successfully approached and rescued all 5 people. The floods divided and isolated many areas of August 30, the Office of the Civil defense command department of Quang Tri province said that the impact of typhoon No. 6, in Quang Tri province has moderate rain, heavy rain, there is a very heavy rain. Floods caused many traffic routes in Quang Tri province to be flooded, severely damaged, divided the traffic. The road surface, taluy roof at km23+450 DT.571 is eroded, eroding the roof of the talk deep into the road to create a cleft of frog. At the overflow road at km25+750, the roadside is 30 m long, causing the travel of people and vehicles to be completely congested. Currently, people have a need to temporarily circulate by cutting through the trails and self -opened ways. The information from the Traffic Management and Maintenance Board of the Department of Construction said that due to the impact of heavy rain from storm No. 6, outside the route DT.571, on the route DT.588A at the location of the spillway - Km11+240 flooded water about 40cm causing traffic congestion. To ensure safety, the unit has sent people to set up latches, stretched and signs to limit the passing; Urgently arrange human resources and means to repair damaged points when the weather is favorable. The DT.571 route through Ben Quan commune, adjacent to Ho Chi Minh road, the West branch was swept away by a road and divided traffic. As upstream of Hieu River (measured at the first TV station) has exceeded the alarm level 3. Update until 16:00 this afternoon, the water level of rivers in the province fluctuates at an alarm level 1; On Kien Giang River, measured at Kien Giang station is 10.01 m in excess of alarm 1 of 2.01 m; In Le Thuy is 2.55 m in alarm 2 of 0.35m.QL9B, there are 2 flooded positions: At underground km41+900, km43+700/QL9B flooded 0.3-0.4m people and vehicles cannot be back and forth; DT 571 route at Km25+900 flooded 1.5m; DT.588A route bridge overflow - Km11+240 with 30cm; traffic rules; DT 559B 4 underground position overflow from 0.3-0.4m at some positions. Until 17h on August 30, there are some overflow underground withdrawal such as underground fence of Phong Nha commune; The flooded points of Huong Lap, Tan Lap and Con Tien commune have withdrawn all the people traveling normally. However, the situation of mud from the highway poured into peoples houses, peoples roads, and large peoples garden (in Con Tien commune). However, in Quang Tri province, there are still 17 flooded, isolated and separated points. All deep flooded traffic spots have been made and organized to guard people and vehicles. At Huong Lap commune, Ho Chi Minh road has 1 landslide point at Km175+200 with about 5m3 of rock and 1 point of land, breaking at the underground overflow in Se Pu village to Cu Bai; Patrol roads Phung Phung - Lao Bao landslide KM8+200, 30-40 deg Mm3 of rocks, people and vehicles cannot be passed (BP Phung Phung station area) .The Department of the Provincial Civil Defense Command said that units and localities closely monitor the development of typhoon No. 6 to promptly direct and implement measures to cope and evacuate people according to each stage of storms and rain. In particular, the work of emergency evacuation people in areas with high risks of flooding, landslides and flash floods is top priority, in order to ensure maximum safety in terms of life and property of the people. Until 17:00 pm on August 30, in Quang Tri province, there were still 17 points of flooding, isolated and divided. Canopy 57 households/165 from the dangerous areas of the localities organized evacuating 57 households/165 from the danger area (Xu Xian Lap 2 households/7 guns; Ben Quan commune: 22 households/85 passwords; Hieu Giang Commune: 33 households/93 people. The reservoirs in the province operate to ensure safety. The average capacity of 52 medium and large reservoirs reaches about 65.38% of the design capacity. Today, Mr. Tran Phong, Chairman of Quang Tri Peoples Committee has checked the actual, directing the response to storm No. 6 and floods at crucial points. Through actual inspection, the Chairman of the Provincial Peoples Committee requested departments, branches, units and localities to actively respond to floods due to the impact of storm No. 6; resolutely not to occur incidents, ensure the safety of peoples lives, protect the safety of key projects. Therefore, localities need to be particularly alert, ready to respond, organize the relocation and evacuation of people out of the dangerous area in time and at the right time. Nhat Anh - Luu HuongTham more examination

🔍 Key Information

📄
Tender Reference No.
522263058
📅
Publication Date
01 Sep 2025
🌐
Sector
Environment and Pollution
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 01 Sep 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…