Roads and Highways

Providing Steel Gabions Tender

📄 Tender ID: 525603334 📅 Published: 28 Nov 2025

📋 Tender Overview

Hundreds of large and small landslides continued to appear after the floods, causing many national highways in the Central and Central Highlands to be cut off. The Ministry of Construction requires forces to be on duty 24/7, urgently mobilize resources, materials and human resources to handle the scene and soon resume traffic on arterial routes. Many locations are continuing to seriously erode - Photo: Construction Newspaper. A quick report from the Ministry of Construction on the morning of November 27 said that on locally managed national highways, there are currently 15 traffic jam locations, most concentrated on National Highway 27C and National Highway 20. In Khanh Hoa, National Highway 27C still has 12 blocked points due to landslides in steep terrain and water-saturated ground. Of these, there are 5 old points (3 points have been opened to traffic) and 10 new points have arisen. The forces aim to open the entire route to traffic before December 4. In Lam Dong, there are still 3 traffic jams, including 2 landslides on National Highway 20 (Mimosa Pass and DRan Pass areas) and 1 location on National Highway 27C at Km65+800 - Km66+00. Urgently provide 12,000 steel gabions to reinforce the project. Immediately after the natural disaster, the Ministry of Construction Construction has sent many working groups to heavily affected localities such as Da Nang, Quang Ngai, Gia Lai, Khanh Hoa, Dak Lak and Lam Dong to inspect the scene and direct the response. Road management units remain on duty 24/24, mobilizing maximum vehicles and supplies according to the motto 4 on the spot to quickly handle arising situations. Despite continuous efforts, prolonged floods have caused landslides and flooding in hundreds of locations, making some national highways unable to fully open to traffic. Congestion points are mainly located on National Highway 27C (Khanh Hoa, Lam Dong) and National Highway 20. To support localities, the Vietnam Road Department has regulated backup materials, providing 12,000 steel gabions for affected routes: Da Nang 5,000, Quang Ngai 2,000 and Lam Dong 5,000 steel gabions to urgently reinforce serious landslide locations. The Ministry of Construction requires close coordination with local Departments of Construction, sending technical staff directly to the scene to propose sustainable reinforcement solutions to limit landslide recurrence. The Vietnam Road Administration coordinated with the Department of Construction of Khanh Hoa and Lam Dong to handle serious landslides on National Highway 27C, sending professional staff to support and research technical solutions to repair, sustainably reinforce, and limit the recurrence of landslides. Quy Nhon - Chi Thanh, Chi Thanh - Van Phong expressways suffered heavy damage. From Da Nang to Khanh Hoa, there are currently 5 key traffic projects, including 4 projects under construction. (Quang Ngai - Hoai Nhon, Hoai Nhon - Quy Nhon, Quy Nhon - Chi Thanh, Chi Thanh - Van Phong) is expected to be completed on December 19, 2025 and 1 project has been put into operation (Van Phong - Nha Trang). During the flood, although there was no loss of life, many projects under construction were seriously affected. In particular, the Quy Nhon - Chi Thanh and Chi Thanh - Van Phong projects were flooded, damaged the operating house, camp, and concrete mixing plant; The construction electrical system suffered widespread loss; Local workers have to take time off work to overcome the consequences at home; Quarries supplying materials must be temporarily suspended; The transport road was flooded and seriously damaged. Some locations had deep slope slides, causing cracks in the foundation, foundation and road surface, affecting the traffic safety system. After the floods, local contractors in Tuy An and Dak Lak organized surveys and treatment to ensure long-term stability. By 9:00 p.m. on November 25, the railway was completely open. However, there are still some positions where the train must run slowly and are continuing to be reinforced by forces - Photo: VNR Mobilizing total force to overcome the Mimosa pass landslide. Currently, Gia Lai and Lam Dong have 2 renovation and upgrading projects including National Highway 19 and the Mimosa Pass project on National Highway 20. Although there was no loss of life, many items were greatly affected. At National Highway 19, the An Khe Pass section had to be closed due to the risk of landslides, but is now open to two-way traffic. The most serious is the Mimosa Pass project. On November 18, the negative slope of Km226+600 - Km226+800 subsided and slid; By November 20, the entire foundation and road surface on this section were completely fractured and slid, forming a hole nearly 15 m deep, with a landslide length of about 50 m, causing Mimosa Pass to be divided. At Treo Bridge (Km262+500, National Highway 20), about 60,000 m3 of soil and rock fell onto the road surface, cracking and sinking the road surface, dislodging retaining walls, paralyzing traffic. Many new cracks appeared on the slope top, continuing to grow, threatening the safety of the project. Faced with that situation, the Ministry of Construction issued Decision 2105/QD-BXD declaring an emergency situation of natural disasters at Mimosa Pass, assigning relevant units to urgently issue orders for emergency construction, review and determine capital sources to submit to competent authorities. For Treo Bridge, the Ministry assigned Project Management Board 85 to coordinate with the Department of Construction and Forestry. At the same time, ensuring temporary traffic safety, urgently handling slippage, requiring the contractor to carry out warranty responsibilities and the survey design unit to come up with a long-term solution. The railway suffered heavy damage. By 9:00 p.m. on November 25, the railway was completely open. However, there are still some locations where you must run slowly as follows: From Km1211+800 to Km1215+300 (V = 5 Km/h), from Km1215+300 to

🔍 Key Information

📄
Tender Reference No.
525603334
📅
Publication Date
28 Nov 2025
🌐
Sector
Roads and Highways
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 28 Nov 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…