📋 Tender Overview
Investors propose competent authorities to allow the proposal of investment policy to expand the Hanoi - Bac Giang highway to 10 lanes in the method of public -private partnership (PPP). The Hanoi -Bac Giang highway has the current flow of vehicles continues to increase evenly at a speed of about 11% per year in the last three years of BOT Hanoi - Bac Giang Investment Joint Stock Company, which has sent a document to the Ministry of Construction and the Vietnam Road Administration, proposing to expand the Hanoi - Bac Giang Expressway to 10 lanes in the form of public - private partnership (PPP). turns day and night. Meanwhile, according to the financial plan in the BOT contract, the load flow of the route in 2022 is only 46,000 times/day and night. Remarkably, the flow of vehicles continues to increase evenly at a speed of about 11% per year in the last three years. In terms of increasing the vehicle, the route has fallen into overload, no longer guaranteeing the speed of exploitation, frequent congestion, potential risk of accident and increasing transport costs, affecting the competitiveness of the region. It is necessary, however, on the basis of the rapid increasing flow, BOT Hanoi - Bac Giang Investment Joint Stock Company proposed the Ministry of Construction to allow the proposal to expand the route to 10 lanes in the PPP method to meet the increasing transport demand, improve service quality, reduce congestion and traffic accidents. Including Van Phu Investment Joint Stock Company, Dong Son Infrastructure Investment Joint Stock Company, Vietnam Import Export and Construction Corporation, Ocean Group Joint Stock Company is an investor. Hanoi - Bac Giang Expressway has a total length of more than 46km, has been put into operation in April 2016 and starts toll collection from May of the same year, with a toll time lasting 21 years. The route starts at km 113+985 (National Highway 1), the territory of Dinh Tri ward, Bac Giang city and ends at km 159+100 (the location of the old Phu Dong toll station), the territory of Phuc Loi ward, Long Bien district, Hanoi. The section from Bac Giang to Nhu Nguyet bridge has 4 lanes, the road floor is 33m wide. The paragraph from Nhu Nguyet bridge to Km 159+258 also has 4 lanes, 34m wide road background. According to the planning of the road network period 2021 - 2030, vision to 2050 approved by the Prime Minister, Hanoi - Bac Giang - Lang Son highway has a length of 137km and a scale of 6 lanes. Particularly, Hanoi - Bac Giang section is 46km long, expanded to 8 lanes.