📋 Tender Overview
Provias Nacional, executing unit of the Ministry of Transportation and Communications, is advancing with the repair work on the Sullana bridge, which is located at km 935, on the Sullana - Mancora section of the North Pan-American highway, with the aim of recovering the structural capacity and guaranteeing the safety of the users of this important road in Piura.
The work carried out to date consists of the demolition of the deteriorated slab and the progressive installation of new prefabricated concrete slabs, supported by lifting equipment anchored to the metal structure. Likewise, conditioning work is carried out on the metal superstructure and transverse beams.
The application of this technology allows speeding up intervention times on the road and reducing the impact on vehicular traffic. Specialized technical personnel have been carrying out the assembly and assembly of these prefabricated structures.
It is specified that vehicular traffic remains with a restricted pass. Heavy transport vehicles circulate on the same Sullana bridge on a single lane, in turns, while light transport moves on the old Isaias Garrido bridge, avoiding traffic congestion in the area. According to the schedule, it is estimated that the work will be completed in August of this year.
Provias Nacional urges drivers to respect road safety signs and the instructions of the personnel in charge of controlling the vehicle pass, in order to safeguard the integrity of all users and workers.
With these actions, the sector reaffirms its commitment to preserving passability and road safety in the non-concessioned National Road Network, for the benefit of the population of Piura and the users who travel through this strategic corridor.
Lima, March 6, 2026.