Energy, Power and Electrical

Processing Improves Medium Tender

📄 Tender ID: 521246667 📅 Published: 04 Aug 2025

📋 Tender Overview

These are defined as those with an installed generation capacity between 50 and 200 MW and that are not interconnected to the national electrical system. Today there are ten of the aforementioned systems. All are located at the southern end. Review the content of the project that improves the medium systems in the General Law of Electrical Services and review the changes raised by the lower house, will be one of the tasks to which the Senate must be dedicated. The project initiated into a message, seeks that the planning of the so -called medium -sized systems propens to the development of investments considering the current efficiency and safety variables, the incorporation of renewable energy and storage. Medium electrical systems are defined as those with an installed generation capacity between 50 and 200 MW, and are not interconnected to the National Electric System (SEN). In Chile there are 10 medium systems, all located in the extreme south zone: two in the Los Lagos region, four in the Magallanes region and four in the Aysen region. According to figures from the Ministry of Energy, the number of clients of medium systems is relatively small, reaching units of one thousand or tens of thousand in some cases, such as Palena. This contrasts with the SEN that has millions of customers since it operates from the Arica and Parinacota region to that of Los Lagos. The initiative aims to improve the access of the entire population to electrical services with equitable rates, especially for those who live in the most isolated areas of the country, so that electricity is an engine of development of the territories and improves the independent quality of life of the place where they live. Traditionally problematic to medium systems, the same rules of the national electrical system have been applied, which has generated problems in two key aspects: vertical disintegration: in the national electrical system, the generation, transmission and distribution are legally separated to avoid conflicts of interest and concentrations of power, which has been effective in large markets, but in medium systems, where there is not enough scale, disintegration generates discouragement to invest. Therefore, this project seeks to allow a certain vertical integration in these systems, adapting to its lowest size. Tariff processes: currently, the tariff periods are four years, which works in a large system, where the number of users allows amortizing investments within that period. However, in smaller systems, this period is insufficient to finance investments, which translates into older electrical networks and lower quality services, as occurs in the Aysen and Magallanes regions. The main mechanisms of the project are related to: adjustment of the average knot price. This mechanism balances electrical prices nationwide, reducing the highest rates (such as medium systems) and distributing the cost among a greater number of users. In Aysen, it could reduce rates by 18 to 20% for small businesses and shops, while the impact on other users of the country would be minimum, less than 0.3%. Tariff equity for non -residential customers. The mechanism incorporates commercial and industrial clients of medium -sized systems in the tariff equity policy, which benefits these areas. In that line, the message expands the tariff deadlines, which will allow investments to be financed in longer periods, facilitating the modernization of the networks and improving their quality. It also points to citizen participation, since mechanisms are incorporated so that communities can participate in the design of infrastructure expansions and electrical networks. Finally, it seeks to transfer certain skills related to medium systems to the regions, promoting a closer and efficient management; creates an electronic record of promoters of generation and transmission projects in medium systems; and incorporates a unique study, tendered and awarded by the National Energy Commission (CNE). Image of the Mining and Energy Commission

🔍 Key Information

📄
Tender Reference No.
521246667
📅
Publication Date
04 Aug 2025
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Chile

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 04 Aug 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Chile
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…