Renewable Energy

Prime Minister Approved Tender

📄 Tender ID: 516967844 📅 Published: 17 Apr 2025

📋 Tender Overview

Deputy Prime Minister Bui Thanh Son has just signed Decision No. 768/QD -TTg dated April 15, 2025 of the Prime Minister approving the adjustment of the National Electricity Development Plan for the term 2021 - 2030, with a vision to 2050 (VIII power plan). The Prime Minister approves the adjustment of the VIIIs power planning to clearly state the scope and boundaries of the planning: Planning on the development of the power source and the transmission grid at the voltage supply of 220 kV or more, the industry and the renewable energy, new energy on the territory of Vietnam in the period of 2021 - 2030, with a vision to 2050, including the electric grid links with the neighboring nations. 557.8 billion kWh The specific goal is to provide enough electricity demand in the water, meeting the socio -economic development goals with an average GDP growth of about 10.0%/year in the period of 2026 - 2030, about 7.5%/year in the period of 2031 - 2050. In which commercial electricity: in 2030 reached about 500.4 - 557.8 billion kWh; The orientation in 2050 reached about 1,237.7 - 1,375.1 billion kWh. Production and import electricity: In 2030, it reached about 560.4 - 624.6 billion kWh; Orientation in 2050 is about 1,360.1 - 1,511.1 billion kWh. Maximum capacity: In 2030, about 89,655 - 99,934 MW; In 2050, it reached about 205,732 - 228,570 MW. The fight to 2030 has 50% of office buildings and 50% of people using solar power roofs, self -consumption (serving local consumption, not selling electricity into the national electricity system). 2050 Renewable energy ratio up to 74 - 75%. Building an intelligent grid system, capable of integrating and effectively operating large -scale renewable energy sources. Regarding the development of industrial ecosystems and renewable energy services, it is expected that by 2030, forming 02 industrial centers, inter -regional renewable energy services including production, transmission and power consumption; The industry of manufacturing renewable energy equipment, construction, installation, relevant services, building renewable energy ecosystems in areas with many potential areas such as Northern, South Central and Southern conditions when there are favorable conditions. Striving to 2035, the scale of electricity exports will reach about 5,000 - 10,000 MW, which may be higher depending on the needs of the importer on the basis of high economic efficiency, ensuring domestic energy security and national security and defense. Renewable energy in the structure of electricity and production power. Body, promoting the development of wind power on the shore, near the shore and offshore, solar power, especially the solar power, the water is suitable for the absorption capacity of the system, the ability to relieve the power of the grid, the cost of the electricity and the reasonable transmission cost associated with the operating safety and the overall economy of the electricity system. Priority, encourage the development of wind and solar power (including solar power on peoples roofs, commercial centers, roofs of construction works, workshop roofs, industrial parks, solar electricity at production and business establishments) consumed on -site, without connecting or not selling electricity into national electricity grids. Development of concentrated solar power must be combined with installation of storage battery with a minimum of 10% of capacity and capacity in 2 hours. By 2030, the total wind power on the shore and near the shore reached 26,066 - 38,029 MW to 2030, the total wind power on the shore and near the shore reached 26,066 - 38,029 MW (the total technical potential in Vietnam is about 221,000 MW). Priority is given to the arrangement of newly planned wind power sources in localities with good wind potential and difficult economic conditions. Maximize the potential of offshore wind power techniques of our country (about 600,000 MW) to produce new electricity and energy: total offshore wind power to serve the domestic electricity demand of about 6,000 - 17,032 MW, expected to operate the period of 2030 - 2035. Orientation to 2050 reached 113,503 - 139,097 MW. MW in 2050, Vietnams solar power energy is about 963,000 MW of Vietnams solar power, about 963,000 MW (ground - 837,400mw, water surface - 77,400 MW and roof - 48.200 MW). By 2030, the total capacity of solar power sources (including concentrated solar power and roof solar power, excluding solar power sources under Clause 5, Article 10 of the Electricity Law No. 61/2024/QH15) reached 46,459 - 73,416 MW; Orientation to 2050, total capacity 293.088 - 295,646 MW. In 2030, the total biomass power source is about 1,523 - 2,699 MW; Electricity produced from garbage and solid waste is about 1,441 - 2,137 MW; Geographic electricity and new energy are about 45 MW. Orientation to 2050, biomass electricity is about 4,829 - 6,960 MW; electricity produced from solid waste and solid waste is about 1,784 - 2,137 MW; Geographic electricity and other new energy is about 464 MW. The maximum potential of hydroelectric resources also clearly stated: Maximum exploitation of economic - technical potential of hydropower sources (maximum potential in Vietnam is about 40,000 MW) on the basis of environmental guarantee, forest protection, water security protection. Selectively expand existing hydroelectric plants to prevent capacity; exploiting hydroelectricity on irrigation lakes and reservoirs to take advantage of hydraulic sources. By 2030, the total capacity of hydropower sources, including small hydroelectricity reached 33,294- 34,667 MW, oriented in 2050, the total capacity reached 40,624 MW. Developing capacity hydropower plants with a capacity of about 2,400-6,000 MW to 2030 in terms of electricity storage and development of capacity hydropower plants with a capacity of about 2,400- 6,000 MW until 2030; Orientation to 2050, the capacity of hydroelectricity is 20,691 -21,327 MW to regulate the load, prevent capacity and sup

🔍 Key Information

📄
Tender Reference No.
516967844
📅
Publication Date
17 Apr 2025
🌐
Sector
Renewable Energy
📝
Notice Type
News
📍
Location
Viet nam

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 17 Apr 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Viet nam
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…