Energy, Power and Electrical

President Ilham Aliyev Tender

📄 Tender ID: 519545396 📅 Published: 24 Jun 2025

📋 Tender Overview

President Ilham Aliyev has attended the opening of the Central Aran Regional SCADA Management Center in Yevlakh





President of Azerbaijan Ilham Aliyev has today inaugurated the Central Aran Regional SCADA OJSC in Yevlakh.
The chairman of AzerisIK OJSC Vugar Ahmadov informed the head of state to the head of state.
It was noted that through the Management Center, the state, catering and service facilities, catering and service facilities, especially the electricity of electricity, especially the electricity supply of the population, will be provided. Here, the capacity of 35/10 kV, two power transformers, which is 6.3 MVA, 35 and 10 kV indoor distribution devices equipped with modern equipment have been installed.
A 14-kilometer-long power supply line was laid at the Yevlakh s / s. Dalimammadli, Kurakchay, Agdash, Agsu, Agsu, Tartar and iron concrete products were integrated into the Central Aran Regional SCADA Management Center. Thus, the constant tracking and management of technical parameters from the Unified Center to the operative dispatcher. The center is designed for the innovative solution of control, protection and management systems that collect and process all data on the state of electric networks, as well as the management of equipment in digital format. This project ensures the development of optical digital measurement transformers and new generation digital equipment complexes in substations. In addition to supporting the high-precision and unity of all technological measurements, along with the support of reliable operation of the network, there are conditions for reducing losses and general operating costs in the distribution of electricity. The center has the opportunity to inform you about planned interruptions that are nourished from the center. The construction of the substation in the multifunctional mode for the amount of electricity received and transmitted to the multifunctional mode ensures the coordination of the device and equipment with each other. Here, the transactions are automatically adapted to the requirements of the distribution network, as well as decision-making information and technical security systems, the integration of green energy sources in the network. The center located in the center is a closed type. Therefore, the operation and management operations are not needed permanently due to the distance. Fast energy devices have been installed for electric cars to serve the population in the center.


2025-06-23

🔍 Key Information

📄
Tender Reference No.
519545396
📅
Publication Date
24 Jun 2025
🌐
Sector
Energy, Power and Electrical
📝
Notice Type
News
📍
Location
Azerbaijan

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 24 Jun 2025
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Azerbaijan
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…