📋 Tender Overview
Next to the Nieport stop on the era Canal a new 100-ton railway bridge structure was put on as part of the works of PKP Polskie Linie Kolejowe SA. The rebuilt bridge will increase the possibilities of travel and transport of goods on the Wieliszew - Radzymin - Tuszcz line. The funds for the reconstruction come from the PLK budget.At the era Canal next to the stop in Nieport on the Wieliszew - Radzymin route lk10 there is already a new structure based on new abutments. The next stage will be the execution of a reinforced concrete slab. Then the track will be laid. The crossing will increase the level of safety and facilitate the smooth passage of trains.Still this year after completion of the works passenger trains will be able to cross the bridge at a speed of 100 km h and freight trains at 80 km h. Previously passenger trains could travel 40 km h - 60 km slower.The bridge works in Nieport will be performed by PLK using a break in rail traffic introduced from July to the end of October this year at the request of the General Directorate for National Roads and Motorways in connection with the extension of the national road No. 61 on the Legionowo - Zegrze section.