📋 Tender Overview
PKP Polskie Linie Kolejowe SA signed a contract for the reconstruction of the bridge over the Pilica river in Tomaszow Mazowiecki. The new structure on reinforced supports will ensure efficient long-distance connections Krakow - Warsaw Szczecin - Poznan - Krakow Gdynia - Lodz - Krakw and regional connections d - Drzewica. The task worth PLN 13.5 million is implemented from the budget.The investment will result in efficient and safe journeys on the section between Tomaszw Mazowiecki and Radzice where passenger and freight trains run every day - these are regional trains Lodz Fabryczna - Drzewica and long-distance trains e.g. Krakw Gwny - Warszawa Gdaska Krakow Gowny - Pozna Gwny Krakw Gwny - Szczecin Gwny Krakw Gowny - Gdynia Gowna. The crossing over the Pilica river in Tomaszw Mazowiecki consists of two parallel bridges. One of them on the line towards Opoczno and Skarysko-Kamienna No. 25 was renovated in 2015.Thanks to the signed contract there will also be a new construction on the neighboring facility - a parallel line towards the Central Railway Main Line and Radom No. 22. The new bridge will be similar to the adjacent truss bridge. The planned works will make it possible to increase the speed of passenger trains to 120 km h now 100 km h and freight trains to 100 km h currently 80 km h.The old structure of the 170-meter-long bridge will be dismantled. Pillars and abutments will be reinforced. New spans will be erected on them. Then a new track will be laid and the overhead contact line will be displayed. The task is carried out in the design and build formula. After the design phase construction is scheduled to start in the second half of 2022. The investment will be completed at the end of 2023.Better journeys between d and MazowieckieThe works are a continuation of works on the line from Tomaszw Mazowiecki through Radzice to Radom. For travelers incl. The conditions of service at the stops Tomaszw Mazowiecki Brzustw Antoninw Dba Opoczyska and Radzice have already been improved.PLK on the route connecting the province. d and the voivodeship Mazowieckie voivodships also perform track works and replace the traction network which contributes to the improvement of train passage conditions.