📋 Tender Overview
On the Munina - Hrebenne line connecting Podkarpacie with the Lublin region PKP Polskie Linie Kolejowe SA is building a new bridge over Lubaczwka in Nowa Grobla. Good reconstruction and efficient transport of goods to industrial plants and the border crossing in Werchrat will also be ensured by reconstruction of the bridge in Lubaczw and renovation of the track on the route Horyniec Zdrj - Werchrata. PLN 31 million from own funds was allocated to the works.On the Munina-Hrebenne railway route in Nowa Grobla PLK are building a new bridge. The steel structure on the Lubaczwka river will replace a single-span structure from 1949. The existing elements have already been dismantled. The foundations of new abutments are being prepared on the bank. At the same time works on the reconstruction of the bridge over the Sootwa River are progressing in Lubaczw. There will be a better technical construction in the place of the exploited crossing. PLK will use the object obtained during the reconstruction of the line in Pszczyna. The old elements have already been dismantled and new bridgeheads are being built. The rail crossings in Nowiny Horyniecki will also be renovated.PLK keep the railway history. The steel structures of the bridges from Nowa Grobla and Lubaczw will remain in the region. PLK handed over the objects to the Lubaczw commune. They will be presented in the railway museum at Basznia station.In addition to the reconstruction of bridges on the monorail line Munina - Hrebenne No. 101 the track on the route Horyniec Zdrj - Werchrata is being renovated. The work will remove speed limits and improve train travel. There are trains on the route in Jarosaw - Horyniec Zdrj and Rzeszw - Horyniec Zdrj routes. In the summer season you can also travel between Rzeszw and Zamo as well as Jarosaw and Lublin. The railway line will also ensure efficient transport of goods among others to the plants in Surochw and to the border crossing in Werchrat.In 2020 PLN 31 million was allocated to works on the Munina-Hrebenne line. They are financed from PLKs own funds. On the Munina-Hrebenne line No. 101 in the years 2018-2019 the tracks at the Basznia station were renovated. The safety level at 4 crossings in the communes of Lubaczw Laszki and Oleszyce was increased by the reconstruction of rail-road intersections.The Munina - Hrebenne line is one of three rail routes connecting the Podkarpackie and Lubelskie voivodships.Changes in train traffic organizationThe scope of works carried out on the single-track route required the introduction of replacement bus communication from 15032020 to 26062020. The changes have been included in the timetable and agreed with the carriers. Details are available on the website portalpasazera.pl timetable-pkp.pl and on the website of carriers.History LineThe railway line between Munina and Hrebenne is 83 km away. This is the route of the former Jarosaw-Sokalska Railway. The first train from Jarosaw to Sokal via Munina - Lubaczw Hrebenne and Rawa Ruska passed on June 6 1884. After World War II the Werchrat - Hrebenne section was built.