📋 Tender Overview
The span of the railway bridge from Krakow enables efficient and safe passage of trains on the Herby Nowe - Kpno route. PKP Polskie Linie Kolejowe SA uses the facilities from the modernized lines in new locations. After the necessary inspections the structures are still an essential link in the railway network.On the Wyderka River in Janinow on the Herby Nowe - Kpno line trains run along the structure from the railway bridge in Krakow. It is used by passenger and freight trains - over 20 trains a day. Safe passage of longer and heavier freight trains is ensured. The 26-meter steel span from the Vistula River was laid on new reinforced concrete abutments. The foundations of the abutments were also strengthened. The track was replaced. Works next to the crossing are coming to an end. The steel span over Wyderka comes from the bridge over the Vistula River in Krakw. A new bridge is being built on the international line.The facilities from the railway lines after a detailed inspection or additional works are used on less frequented lines. After being checked by specialists not only sleepers and rails but large bridge structures still serve railways. It is a rational management of still good materials and optimal use of the resources of the maintenance program.Only 12 spans were reused from the bridge over the Vistula River in Krakw. Twelve steel elements after renovation were used for viaducts and bridges incl. in Zagorze in Podkarpacie where they will replace the worn-out railway bridge over the San river. Three of them went to Czstochowa on the Kielce - Fosowskie line. The remaining spans are used for the revitalization of railway viaducts incl. in Krasnystaw and Ryki in the Lublin region and Wojkowice in the province. Silesian.