Bridges and Tunnels Infrastructure and construction

Poland Army Building Tender

📄 Tender ID: 456370314 📅 Published: 09 Sep 2020

📋 Tender Overview

The Polish Army is always ready to provide help when needed. Just like a year ago the Polish Army will erect a pontoon bridge on which a pipe will be laid which will be used to roll waste to the Czajka sewage treatment plant. We are undoubtedly dealing with an ecological disaster. The discharge of waste into the Vistula River is a real ecological threat. Undoubtedly we are also dealing with an omission on the part of the Warsaw local government on the part of President Trzaskowski - said Mariusz Baszczak the Minister of National Defense.The head of the Ministry of National Defense presented details of the construction of a pontoon bridge over the Vistula River. The military helps to reduce the effects of repeated failure of sewage collectors in Warsaw.- The soldiers of the Polish Army will once again prepare a pontoon bridge. At the same time they prove that they are always ready to help in crisis situations. The construction of the bridge is currently being prepared on the left bank of the Vistula River north of the Maria Skodowska-Curie Bridge. The task of building and maintaining the crossing was assigned to soldiers from the 2nd Engineering Regiment from Inowrocaw and the 2nd Masovian Sapper Regiment from Kazu.The head of the Ministry of National Defense also referred to questions about the cost of building a temporary bridge. - The Polish Army of course does not expect reimbursement in unexpected situations. In the case of Warsaw we have a situation that was predictable it results from President Trzaskowskis disregard of his duties so it is not a catastrophe or an event that could not be expected. If we are dealing with such a situation the Polish Army will recover direct costs. In the case of the construction of this crossing I want to assure you that the amounts will be lower than for example the relaxation zone created by President Trzaskowski at Plac Bankowy. These costs will be much much lower than for example subsidies for non-governmental organizations that deal with the ideology of equality - said the head of the Ministry of National Defense.About 200 soldiers and 130 units of equipment will be involved in the construction of the pontoon bridge over the Vistula. As in the previous year the bridge will be ready within three days and its total length will be almost 250 meters.- I would like to emphasize that over 50 soldiers will supervise the maintenance of the bridge and the construction of the bridge is a task that will be performed by up to 200 soldiers. The bridge is 245 meters long and consists of six parts that will be connected and anchored to ensure the stability of the crossing. I would like to emphasize that this crossing is possible until November due to weather conditions. It is extremely important that the Warsaw authorities carry out the final renovation the final removal of the failure so that they can ensure safety at that time said the minister.Minister Baszczak thanked the soldiers and commanders for their commitment and quick and effective organization of the construction of the pontoon bridge. - The city has set the date of the bridge construction on September 10 so on September 10 the bridge will be ready for use. I would like to emphasize the great commitment and professionalism of the soldiers - emphasized the head of the Ministry of National Defense.

🔍 Key Information

📄
Tender Reference No.
456370314
📅
Publication Date
09 Sep 2020
🌐
Sector
Bridges and Tunnels
📝
Notice Type
News
📍
Location
Poland

📁 Documents & Downloads

No documents found

🏷️ CPV

No CPV found

Need help with this bid?

Our bid experts can help you find, evaluate & win more tenders.

🎧 Talk to Bid Expert
🕒 Submission deadline
0
days remaining · 09 Sep 2020
🔔 Set Alert

🧭 Quick Facts

Authority N/A
Country Poland
State / UT N/A
Tender Type Procurement News
Currency N/A
Similar Tenders
Loading similar tenders…